ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Stone mining and quarrying
SIC 2+ Digits Required
3+ Characters Required for Products

9

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,550k 197k
MMBtu
$13.48
- Electrical $791k 16,542k
kWh
$0.052
- Natural Gas $159k 20k
MMBtu
$1.71

47

Recommendations

5.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $110k 13k
MMBtu
6.8%
- Electrical $71k 1,312k
kWh
7.9%
- Natural Gas $1.4k -
MMBtu
-
Waste -
Productivity/Other $149k
TOTAL $258k
*May be negative reflecting an increased cost component required to save energy and costs overall

7

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,770k 245k
MMBtu
$8.83
- Electrical $1,000k 21,043k
kWh
$0.056
- Natural Gas $204k 26k
MMBtu
$2.20

18

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $26k 3.2k
MMBtu
1.3%
- Electrical $16k 311k
kWh
1.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $51k
TOTAL $77k
*May be negative reflecting an increased cost component required to save energy and costs overall