ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Stone mining and quarrying
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,495k 224k
MMBtu
$8.76
- Electrical $793k 18,509k
kWh
$0.055
- Natural Gas $238k 31k
MMBtu
$2.57

29

Recommendations

4.8

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $127k 19k
MMBtu
8.3%
- Electrical $97k 1,807k
kWh
9.8%
- Natural Gas $2.2k -
MMBtu
-
Waste -
Productivity/Other $37k
TOTAL $164k
*May be negative reflecting an increased cost component required to save energy and costs overall

6

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,495k 224k
MMBtu
$8.76
- Electrical $793k 18,509k
kWh
$0.055
- Natural Gas $238k 31k
MMBtu
$2.57

13

Implemented Recommendations

2.2

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $18k 2.3k
MMBtu
1.0%
- Electrical $11k 224k
kWh
1.2%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $6.6k
TOTAL $25k
*May be negative reflecting an increased cost component required to save energy and costs overall