ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Stone mining and quarrying
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,471k 181k
MMBtu
$14.48
- Electrical $712k 14,888k
kWh
$0.047
- Natural Gas $143k 18k
MMBtu
$1.54

53

Recommendations

5.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 12k
MMBtu
6.7%
- Electrical $64k 1,181k
kWh
7.9%
- Natural Gas $1.3k -
MMBtu
-
Waste -
Productivity/Other $184k
TOTAL $289k
*May be negative reflecting an increased cost component required to save energy and costs overall

8

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,668k 220k
MMBtu
$10.47
- Electrical $875k 18,413k
kWh
$0.049
- Natural Gas $179k 23k
MMBtu
$1.93

18

Implemented Recommendations

2.3

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $23k 2.8k
MMBtu
1.3%
- Electrical $14k 272k
kWh
1.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $44k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall