ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Gold ore mining
SIC 2+ Digits Required
3+ Characters Required for Products

3

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $35,076k 5,856k
MMBtu
$6.44
- Electrical $21,947k 402,057k
kWh
$0.059
- Natural Gas -
-
MMBtu
-

20

Recommendations

6.7

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $2,640k 476k
MMBtu
8.1%
- Electrical $2,502k 46,419k
kWh
11.5%
- Natural Gas -
-
MMBtu
-
Waste $1.7k
Productivity/Other $505k
TOTAL $3,146k
*May be negative reflecting an increased cost component required to save energy and costs overall

3

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $35,076k 5,856k
MMBtu
$6.44
- Electrical $21,947k 402,057k
kWh
$0.059
- Natural Gas -
-
MMBtu
-

9

Implemented Recommendations

3.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $146k 19k
MMBtu
0.3%
- Electrical $100k 1,817k
kWh
0.5%
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other $25k
TOTAL $171k
*May be negative reflecting an increased cost component required to save energy and costs overall