The ITAC Statistics page displays the average assessment results for the selected criteria.
1
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,126k | 344k |
MMBtu
|
$3.27 |
- Electrical | $540k | 31,462k |
kWh
|
$0.017 |
- Natural Gas | $79k | 22k |
MMBtu
|
$3.60 |
6
Recommendations
6.0
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $26k | 8.6k |
MMBtu
|
2.5% |
- Electrical | $16k | 839k |
kWh
|
2.7% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | $2.9k | |||
TOTAL | $29k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
1
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $1,126k | 344k |
MMBtu
|
$3.27 |
- Electrical | $540k | 31,462k |
kWh
|
$0.017 |
- Natural Gas | $79k | 22k |
MMBtu
|
$3.60 |
4
Implemented Recommendations
4.0
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $8.2k | 2.4k |
MMBtu
|
0.7% |
- Electrical | $4.5k | 238k |
kWh
|
0.8% |
- Natural Gas | - | - |
MMBtu
|
- |
Waste | - | |||
Productivity/Other | ($-0.1)k | |||
TOTAL | $8.1k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |