ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Mining (except oil and gas)
SIC 2+ Digits Required
3+ Characters Required for Products

41

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,057k 866k
MMBtu
$9.75
- Electrical $2,638k 59,433k
kWh
$0.058
- Natural Gas $569k 119k
MMBtu
$2.31

256

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $483k 60k
MMBtu
7.0%
- Electrical $272k 5,883k
kWh
9.9%
- Natural Gas $41k -
MMBtu
-
Waste $16k
Productivity/Other $258k
TOTAL $757k
*May be negative reflecting an increased cost component required to save energy and costs overall

36

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,619k 969k
MMBtu
$8.01
- Electrical $2,980k 67,311k
kWh
$0.057
- Natural Gas $613k 124k
MMBtu
$2.29

97

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $130k 8.9k
MMBtu
0.9%
- Electrical $37k 871k
kWh
1.3%
- Natural Gas $11k -
MMBtu
-
Waste $7.6k
Productivity/Other $42k
TOTAL $179k
*May be negative reflecting an increased cost component required to save energy and costs overall