ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Mining (except oil and gas)
SIC 2+ Digits Required
3+ Characters Required for Products

40

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,165k 887k
MMBtu
$9.43
- Electrical $2,697k 60,872k
kWh
$0.057
- Natural Gas $582k 122k
MMBtu
$2.14

256

Recommendations

6.4

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $490k 62k
MMBtu
7.0%
- Electrical $277k 6,023k
kWh
9.9%
- Natural Gas $40k -
MMBtu
-
Waste $16k
Productivity/Other $244k
TOTAL $751k
*May be negative reflecting an increased cost component required to save energy and costs overall

34

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,741k 1,009k
MMBtu
$7.75
- Electrical $3,034k 69,920k
kWh
$0.053
- Natural Gas $649k 132k
MMBtu
$2.43

89

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $104k 9.1k
MMBtu
0.9%
- Electrical $34k 884k
kWh
1.3%
- Natural Gas $39k -
MMBtu
-
Waste $8.0k
Productivity/Other $17k
TOTAL $128k
*May be negative reflecting an increased cost component required to save energy and costs overall