ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Mining (except oil and gas)
SIC 2+ Digits Required
3+ Characters Required for Products

34

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,741k 1,009k
MMBtu
$7.75
- Electrical $3,034k 69,920k
kWh
$0.053
- Natural Gas $649k 132k
MMBtu
$2.43

222

Recommendations

6.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $531k 72k
MMBtu
7.1%
- Electrical $321k 7,026k
kWh
10.0%
- Natural Gas $75k -
MMBtu
-
Waste $19k
Productivity/Other $205k
TOTAL $755k
*May be negative reflecting an increased cost component required to save energy and costs overall

33

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,828k 1,029k
MMBtu
$7.73
- Electrical $3,062k 71,092k
kWh
$0.052
- Natural Gas $669k 136k
MMBtu
$2.50

89

Implemented Recommendations

2.7

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $107k 9.3k
MMBtu
0.9%
- Electrical $35k 911k
kWh
1.3%
- Natural Gas $40k -
MMBtu
-
Waste $8.3k
Productivity/Other $17k
TOTAL $132k