ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Mining (except oil and gas)
SIC 2+ Digits Required
3+ Characters Required for Products

43

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,884k 829k
MMBtu
$10.19
- Electrical $2,536k 56,940k
kWh
$0.057
- Natural Gas $543k 114k
MMBtu
$2.30

272

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $471k 59k
MMBtu
7.1%
- Electrical $269k 5,738k
kWh
10.1%
- Natural Gas $39k -
MMBtu
-
Waste $15k
Productivity/Other $243k
TOTAL $729k
*May be negative reflecting an increased cost component required to save energy and costs overall

40

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,168k 887k
MMBtu
$9.05
- Electrical $2,701k 60,879k
kWh
$0.058
- Natural Gas $583k 122k
MMBtu
$2.37

102

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $123k 8.2k
MMBtu
0.9%
- Electrical $34k 797k
kWh
1.3%
- Natural Gas $9.5k -
MMBtu
-
Waste $6.8k
Productivity/Other $58k
TOTAL $188k
*May be negative reflecting an increased cost component required to save energy and costs overall