ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Mining (except oil and gas)
SIC 2+ Digits Required
3+ Characters Required for Products

42

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $4,933k 845k
MMBtu
$10.33
- Electrical $2,577k 58,026k
kWh
$0.060
- Natural Gas $555k 116k
MMBtu
$2.26

261

Recommendations

6.2

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $472k 59k
MMBtu
7.0%
- Electrical $265k 5,741k
kWh
9.9%
- Natural Gas $40k -
MMBtu
-
Waste $17k
Productivity/Other $252k
TOTAL $741k
*May be negative reflecting an increased cost component required to save energy and costs overall

35

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $5,682k 986k
MMBtu
$7.98
- Electrical $3,001k 68,198k
kWh
$0.057
- Natural Gas $631k 128k
MMBtu
$2.36

92

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $131k 8.9k
MMBtu
0.9%
- Electrical $36k 873k
kWh
1.3%
- Natural Gas $11k -
MMBtu
-
Waste $7.8k
Productivity/Other $34k
TOTAL $173k
*May be negative reflecting an increased cost component required to save energy and costs overall