ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Support activities for crop production
SIC 2+ Digits Required
3+ Characters Required for Products

13

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $497k 40k
MMBtu
$15.32
- Electrical $361k 3,829k
kWh
$0.11
- Natural Gas $9.5k 1.0k
MMBtu
$4.07

86

Recommendations

6.6

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $99k 8.6k
MMBtu
21.3%
- Electrical $73k 843k
kWh
22.0%
- Natural Gas $0.9k -
MMBtu
-
Waste $27k
Productivity/Other $13k
TOTAL $139k
*May be negative reflecting an increased cost component required to save energy and costs overall

12

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $526k 43k
MMBtu
$14.87
- Electrical $378k 4,089k
kWh
$0.10
- Natural Gas $10k 1.0k
MMBtu
$3.21

49

Implemented Recommendations

4.1

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $62k 5.8k
MMBtu
13.5%
- Electrical $46k 570k
kWh
13.9%
- Natural Gas $0.4k -
MMBtu
-
Waste $29k
Productivity/Other $14k
TOTAL $105k
*May be negative reflecting an increased cost component required to save energy and costs overall