ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Support activities for agriculture and forestry
SIC 2+ Digits Required
3+ Characters Required for Products

16

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $493k 42k
MMBtu
$14.70
- Electrical $346k 3,603k
kWh
$0.11
- Natural Gas $32k 4.5k
MMBtu
$5.02

100

Recommendations

6.3

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $85k 7.4k
MMBtu
17.7%
- Electrical $63k 718k
kWh
19.9%
- Natural Gas $0.7k -
MMBtu
-
Waste $22k
Productivity/Other $11k
TOTAL $117k
*May be negative reflecting an increased cost component required to save energy and costs overall

14

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $532k 45k
MMBtu
$14.41
- Electrical $364k 3,908k
kWh
$0.10
- Natural Gas $36k 5.1k
MMBtu
$4.71

49

Implemented Recommendations

3.5

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $53k 5.0k
MMBtu
11.0%
- Electrical $39k 488k
kWh
12.5%
- Natural Gas $0.3k -
MMBtu
-
Waste $25k
Productivity/Other $12k
TOTAL $90k
*May be negative reflecting an increased cost component required to save energy and costs overall