ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Hog and pig farming
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $619k 107k
MMBtu
$5.79
- Electrical $175k 5,169k
kWh
$0.033
- Natural Gas $308k 52k
MMBtu
$6.06

14

Recommendations

7.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $34k 1.7k
MMBtu
1.5%
- Electrical $5.4k 162k
kWh
3.1%
- Natural Gas $26k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $34k
*May be negative reflecting an increased cost component required to save energy and costs overall

2

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $619k 107k
MMBtu
$5.79
- Electrical $175k 5,169k
kWh
$0.033
- Natural Gas $308k 52k
MMBtu
$6.06

10

Implemented Recommendations

5.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $31k 1.1k
MMBtu
1.1%
- Electrical $3.9k 112k
kWh
2.2%
- Natural Gas $26k -
MMBtu
-
Waste -
Productivity/Other $0.7k
TOTAL $32k
*May be negative reflecting an increased cost component required to save energy and costs overall