ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Animal production and aquaculture
SIC 2+ Digits Required
3+ Characters Required for Products

11

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $354k 48k
MMBtu
$10.48
- Electrical $195k 3,387k
kWh
$0.84
- Natural Gas $67k 11k
MMBtu
$3.75

66

Recommendations

6.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $59k 5.9k
MMBtu
12.3%
- Electrical $28k 571k
kWh
16.9%
- Natural Gas $6.1k -
MMBtu
-
Waste -
Productivity/Other $7.4k
TOTAL $67k
*May be negative reflecting an increased cost component required to save energy and costs overall

11

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $354k 48k
MMBtu
$10.48
- Electrical $195k 3,387k
kWh
$0.84
- Natural Gas $67k 11k
MMBtu
$3.75

29

Implemented Recommendations

2.6

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $21k 1.6k
MMBtu
3.4%
- Electrical $9.6k 156k
kWh
4.6%
- Natural Gas $4.8k -
MMBtu
-
Waste -
Productivity/Other $0.3k
TOTAL $21k
*May be negative reflecting an increased cost component required to save energy and costs overall