ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Other food crops grown under cover
SIC 2+ Digits Required
3+ Characters Required for Products

2

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $1,054k 155k
MMBtu
$7.19
- Electrical $448k 14,172k
kWh
$0.037
- Natural Gas $4.5k 0.6k
MMBtu
$3.72

8

Recommendations

4.0

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $103k 1.0k
MMBtu
0.7%
- Electrical $4.0k 99k
kWh
0.7%
- Natural Gas $4.5k -
MMBtu
-
Waste -
Productivity/Other $4.8k
TOTAL $108k
*May be negative reflecting an increased cost component required to save energy and costs overall

1

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $2,001k 295k
MMBtu
$6.78
- Electrical $843k 27,090k
kWh
$0.031
- Natural Gas -
-
MMBtu
-

1

Implemented Recommendations

1.0

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $178k -
MMBtu
-
- Electrical -
-
kWh
-
- Natural Gas -
-
MMBtu
-
Waste -
Productivity/Other -
TOTAL $178k
*May be negative reflecting an increased cost component required to save energy and costs overall