ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Greenhouse, nursery, and floriculture production
SIC 2+ Digits Required
3+ Characters Required for Products

6

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $647k 81k
MMBtu
$8.01
- Electrical $313k 6,642k
kWh
$0.064
- Natural Gas $37k 5.8k
MMBtu
$3.46

27

Recommendations

4.5

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $182k 6.5k
MMBtu
8.0%
- Electrical $55k 633k
kWh
9.5%
- Natural Gas $33k -
MMBtu
-
Waste -
Productivity/Other $8.9k
TOTAL $190k
*May be negative reflecting an increased cost component required to save energy and costs overall

5

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $755k 94k
MMBtu
$8.09
- Electrical $365k 7,720k
kWh
$0.068
- Natural Gas $42k 6.7k
MMBtu
$2.66

7

Implemented Recommendations

1.4

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $68k 0.4k
MMBtu
0.5%
- Electrical $4.0k 43k
kWh
0.6%
- Natural Gas $36k -
MMBtu
-
Waste -
Productivity/Other ($-3.0)k
TOTAL $65k
*May be negative reflecting an increased cost component required to save energy and costs overall