ITAC Statistics
ITAC logo
ITAC Statistics
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
The ITAC Statistics page displays the average assessment results for the selected criteria.
ARC 2+ Digits Required
NAICS Crop production
SIC 2+ Digits Required
3+ Characters Required for Products

10

Matching Assessments

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $561k 122k
MMBtu
$5.72
- Electrical $293k 10,898k
kWh
$0.044
- Natural Gas $47k 6.0k
MMBtu
$5.19

41

Recommendations

4.1

Recommendations Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $114k 4.9k
MMBtu
4.1%
- Electrical $35k 482k
kWh
4.4%
- Natural Gas $20k -
MMBtu
-
Waste $86k
Productivity/Other $8.2k
TOTAL $208k
*May be negative reflecting an increased cost component required to save energy and costs overall

9

with Implementation Data

Initial Plant Size Averages Costs Usage Unit Cost
All Energy $612k 134k
MMBtu
$5.51
- Electrical $319k 11,969k
kWh
$0.044
- Natural Gas $51k 6.5k
MMBtu
$4.94

16

Implemented Recommendations

1.8

Implemented Per Assessment

Average Rec'd Savings By Type* Cost Savings Usage Reduction % Usage
Reduction
All Energy $43k 1.0k
MMBtu
0.8%
- Electrical $3.5k 98k
kWh
0.8%
- Natural Gas $20k -
MMBtu
-
Waste $95k
Productivity/Other ($-1.7)k
TOTAL $137k
*May be negative reflecting an increased cost component required to save energy and costs overall