The ITAC Statistics page displays the average assessment results for the selected criteria.
11
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $525k | 112k |
MMBtu
|
$6.22 |
- Electrical | $276k | 10,023k |
kWh
|
$0.048 |
- Natural Gas | $43k | 5.6k |
MMBtu
|
$5.26 |
46
Recommendations
4.2
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $110k | 5.2k |
MMBtu
|
4.6% |
- Electrical | $38k | 506k |
kWh
|
5.0% |
- Natural Gas | $18k | - |
MMBtu
|
- |
Waste | $78k | |||
Productivity/Other | $7.5k | |||
TOTAL | $196k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
10
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $567k | 122k |
MMBtu
|
$6.08 |
- Electrical | $298k | 10,900k |
kWh
|
$0.049 |
- Natural Gas | $47k | 6.0k |
MMBtu
|
$5.04 |
17
Implemented Recommendations
1.7
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $39k | 0.9k |
MMBtu
|
0.8% |
- Electrical | $3.5k | 93k |
kWh
|
0.8% |
- Natural Gas | $18k | - |
MMBtu
|
- |
Waste | $86k | |||
Productivity/Other | ($-1.5)k | |||
TOTAL | $124k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |