The ITAC Statistics page displays the average assessment results for the selected criteria.
10
Matching Assessments
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $561k | 122k |
MMBtu
|
$5.72 |
- Electrical | $293k | 10,898k |
kWh
|
$0.044 |
- Natural Gas | $47k | 6.0k |
MMBtu
|
$5.19 |
41
Recommendations
4.1
Recommendations Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $114k | 4.9k |
MMBtu
|
4.1% |
- Electrical | $35k | 482k |
kWh
|
4.4% |
- Natural Gas | $20k | - |
MMBtu
|
- |
Waste | $86k | |||
Productivity/Other | $8.2k | |||
TOTAL | $208k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |
9
with Implementation Data
Initial Plant Size Averages | Costs | Usage | Unit Cost | |
---|---|---|---|---|
All Energy | $612k | 134k |
MMBtu
|
$5.51 |
- Electrical | $319k | 11,969k |
kWh
|
$0.044 |
- Natural Gas | $51k | 6.5k |
MMBtu
|
$4.94 |
16
Implemented Recommendations
1.8
Implemented Per Assessment
Average Recommended Rec'd Savings By Type* | Cost Savings | Usage Reduction | % Usage Reduction |
|
---|---|---|---|---|
All Energy | $43k | 1.0k |
MMBtu
|
0.8% |
- Electrical | $3.5k | 98k |
kWh
|
0.8% |
- Natural Gas | $20k | - |
MMBtu
|
- |
Waste | $95k | |||
Productivity/Other | ($-1.7)k | |||
TOTAL | $137k | |||
*May be negative reflecting an increased cost component required to save energy and costs overall |