1,750
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| WM0256 #05 Y:2025 | 05 | 2025 | Install compressor air intakes in coolest locations | $1,150 | $5,288 |
n/a
|
| WM0256 #04 Y:2025 | 04 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $3,409 | $210 |
n/a
|
| WM0256 #03 Y:2025 | 03 | 2025 | Use optimum size and capacity equipment | $9,367 | $29,591 |
n/a
|
| WM0256 #02 Y:2025 | 02 | 2025 | Recover waste heat from equipment | $14,873 | $10,258 |
n/a
|
| WM0256 #01 Y:2025 | 01 | 2025 | Use antifreeze in cooling towers to allow winter use | $27,625 | $19,139 |
n/a
|
| NL0116 #06 Y:2025 | 06 | 2025 | Utilize higher efficiency lamps and/or ballasts | $411 | $423 |
n/a
|
| NL0116 #05 Y:2025 | 05 | 2025 | Insulate bare equipment | $566 | $655 |
n/a
|
| NL0116 #04 Y:2025 | 04 | 2025 | Install compressor air intakes in coolest locations | $828 | $4,650 |
n/a
|
| NL0116 #03 Y:2025 | 03 | 2025 | Apply for tax-free status for energy purchases | $5,745 | $2,300 |
n/a
|
| NL0116 #02 Y:2025 | 02 | 2025 | Separate and recycle scrap metal to foundry or for sale | $13,580 | $600 |
n/a
|
| NL0116 #01 Y:2025 | 01 | 2025 | Improve air circulation with destratification fans / other methods | $45,419 | $54,600 |
n/a
|
| WM0244 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,099 | $1,720 | |
| WM0244 #03 Y:2025 | 03 | 2025 | Install compressor air intakes in coolest locations | $1,421 | $2,740 | |
| WM0244 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,400 | $4,125 | |
| WM0244 #01 Y:2025 | 01 | 2025 | Reschedule plant operations or reduce load to avoid peaks | $22,838 | - | |
| WM0243 #05 Y:2025 | 05 | 2025 | Install compressor air intakes in coolest locations | $1,814 | $7,679 | |
| WM0243 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,986 | $6,560 | |
| WM0243 #03 Y:2025 | 03 | 2025 | Reduce space conditioning during non-working hours | $15,013 | $3,550 | |
| WM0243 #02 Y:2025 | 02 | 2025 | Isolate hot or cold equipment | $65,812 | $40,930 | |
| WM0243 #01 Y:2025 | 01 | 2025 | Use waste heat from hot flue gases to preheat | $103,411 | $360,000 |