Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

755

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
ST0080 #07 Y:1986 Use demand controller or load shedder $10,682 $6,000
ST0080 #06 Y:1986 Utilize higher efficiency lamps and/or ballasts $3,264 $2,016
ST0080 #05 Y:1986 Utilize energy-efficient belts and other improved mechanisms $1,206 $558
ST0080 #04 Y:1986 Use most efficient type of electric motors $531 $1,333
ST0080 #03 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $1,370 -
ST0080 #02 Y:1986 Recover waste heat from equipment $9,482 $7,000
ST0080 #01 Y:1986 Replace electrically-operated equipment with fossil fuel equipment $18,901 $59,000
ST0079 #08 Y:1986 Install timers and/or thermostats $4,642 $300
ST0079 #07 Y:1986 Air condition only space necessary $1,956 -
ST0079 #06 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $1,982 -
ST0079 #05 Y:1986 Use computer programs to optimize hvac performance $8,933 $15,000
ST0079 #04 Y:1986 Utilize higher efficiency lamps and/or ballasts $502 $110
ST0079 #03 Y:1986 Utilize energy-efficient belts and other improved mechanisms $106 $46
ST0079 #02 Y:1986 Use most efficient type of electric motors $1,295 $2,833
ST0079 #01 Y:1986 Use demand controller or load shedder $2,257 $6,000
ST0078 #09 Y:1986 Utilize higher efficiency lamps and/or ballasts $1,145 $233
ST0078 #08 Y:1986 Analyze flue gas for proper air/fuel ratio $14,044 -
ST0078 #07 Y:1986 Utilize energy-efficient belts and other improved mechanisms $463 $93
ST0078 #06 Y:1986 Use most efficient type of electric motors $540 $1,000
ST0078 #05 Y:1986 Eliminate leaks in inert gas and compressed air lines/ valves $856 -