Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

286

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0051 #06 Y:2025 Lower temperature during the winter season and vice-versa $586 -
NT0051 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,986 $5,609
NT0051 #04 Y:2025 Optimize plant power factor $2,603 $6,709
NT0051 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $12,814 -
NT0051 #02 Y:2025 Replace existing hvac unit with high efficiency model $32,918 $193,830
NT0051 #01 Y:2025 Reduce scrap production $98,944 $80,000
NT0050 #05 Y:2025 Use properly designed and sized hvac equipment $2,692 $7,518
NT0050 #04 Y:2025 Purchase equipment instead of leasing $13,978 $7,020
NT0050 #03 Y:2025 Utilize higher efficiency lamps and/or ballasts $26,369 $56,820
NT0050 #02 Y:2025 Use or replace with energy efficient substitutes $118,800 $170,000
NT0050 #01 Y:2025 Purchase equipment instead of leasing $359,441 $504,900
NT0049 #06 Y:2025 Apply for tax-free status for energy purchases $19,372 $5,000
NT0049 #05 Y:2025 Optimize plant power factor $14,101 $17,176
NT0049 #04 Y:2025 Replace existing hvac unit with high efficiency model $79,073 $292,302
NT0049 #03 Y:2025 Reduce the pressure of compressed air to the minimum required $4,840 -
NT0049 #02 Y:2025 Insulate bare equipment $7,764 $7,308
NT0049 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $17,061 $5,609
NT0047 #08 Y:2025 Reduce space conditioning during non-working hours $852 -
NT0047 #07 Y:2025 Analyze flue gas for proper air/fuel ratio $4,083 $1,434
NT0047 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $25,099 $4,224