ITAC Assessment: NT0070
ITAC logo
ITAC Assessment: NT0070
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2026
Principal Product Base material such as resins and fillers. Powder additive such as colorants
NAICS 325991: Custom Compounding of Purchased Resins
SIC 3087: Custom Compounding of Purchased Plastics Resins
Sales Range $10
M
to 50
M
# of Employees 74
Plant Area 104,199
ft2
Annual Production 7,500,000
lb
Production Hrs. Annual 6,036
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $193,150 4,597,293
kWh
Electricity Demand $131,335 14,143
kW-mo/yr
Electricity Fees $12,080 -
Natural Gas $6,275 751
MMBtu
Waste Disposal Costs
Water Usage $76,381 7,090
Tgal
TOTAL YEARLY COSTS $419,221
RECOMMENDED SAVINGS* $98,362 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
01 2.4322: Use or replace with energy efficient substitutes $42,742 $169,941 $29,687
706,834
kWh
$13,055
-
kW-mo/yr
- -
02 2.8121: Apply for tax-free status for energy purchases $27,500 $44,000 - - $27,500 -
03 4.441: Install automatic packing equipment $14,236 $5,179 - - - $14,236
04 2.2625: Chill water to the highest temperature possible $6,625 - $4,601
109,533
kWh
$2,023
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $3,633 $630 $2,523
60,082
kWh
$1,110
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,626 $5,513 $2,518
59,963
kWh
$1,107
-
kW-mo/yr
- -
TOTAL RECOMMENDED $98,362 $225,263 $39,330
936,412
kWh
$17,295
-
kW-mo/yr
$27,500 $14,236
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs