Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,750

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0346 #10 Y:2026 Recharge batteries on during off-peak demand periods $1,696 -
IC0346 #09 Y:2026 Use or replace with energy efficient substitutes $382 $120
IC0346 #08 Y:2026 Use solar heat to make electricty $97,303 $441,248
IC0346 #07 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $19,018 $66,675
IC0346 #06 Y:2026 Use adjustable frequency drive or multiple speed motors on existing system $11,424 $27,615
IC0346 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $4,665 $3,200
IC0346 #04 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $788 $926
IC0346 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $313 $346
IC0346 #02 Y:2026 Install / repair insulation on steam lines $11,700 $94,345
IC0346 #01 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $296 -
IC0345 #11 Y:2026 Install / repair insulation on steam lines $11,178 $2,752
IC0345 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,563 $1,775
IC0345 #09 Y:2026 Use waste heat from hot flue gases to preheat incoming fluids $6,608 $10,990
IC0345 #08 Y:2026 Eliminate or reduce compressed air usage $709 $2,496
IC0345 #07 Y:2026 Use demand controller or load shedder $819 $1,912
IC0345 #06 Y:2026 Use heat from boiler blowdown to preheat boiler feed water $6,218 $10,544
IC0345 #05 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $1,677 $720
IC0345 #04 Y:2026 Turn off equipment when not in use $18,089 $6,484
IC0345 #03 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $6,117 $5,000
IC0345 #02 Y:2026 Recover waste heat from equipment $1,362 $2,900