Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,618

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
IC0331 #05 Y:2025 Install timers and/or thermostats $3,430 $3,140
IC0331 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $20,360 $39,836
IC0331 #03 Y:2025 Insulate glazing, walls, ceilings, and roofs $218 $722
IC0331 #02 Y:2025 Install occupancy sensors $19,272 $1,413
IC0331 #01 Y:2025 Utilize energy-efficient belts and other improved mechanisms $809 $868
IC0329 #06 Y:2025 Reduce the pressure of compressed air to the minimum required $217 -
IC0329 #05 Y:2025 Use or replace with energy efficient substitutes $1,588 $1,315
IC0329 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,312 -
IC0329 #03 Y:2025 Use or replace with energy efficient substitutes $511 $800
IC0329 #02 Y:2025 Eliminate or reduce compressed air usage $963 $720
IC0329 #01 Y:2025 Install compressor air intakes in coolest locations $388 $1,173
IC0328 #05 Y:2025 Use existing dam to generate electricity $6,679 $33,300
IC0328 #04 Y:2025 Install occupancy sensors $244 $694
IC0328 #03 Y:2025 Minimize operation of equipment maintained in standby condition $239 -
IC0328 #02 Y:2025 Use or replace with energy efficient substitutes $82,241 $385,393
IC0328 #01 Y:2025 Use or replace with energy efficient substitutes $101,072 $435,474
IC0327 #09 Y:2025 Insulate bare equipment $1,978 $756
IC0327 #08 Y:2025 Optimize plant power factor $77,211 $108,749
IC0327 #07 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $696 $288
IC0327 #06 Y:2025 Repair and eliminate steam leaks $5,105 $1,367