7
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Synthetic rubber manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UL2304 #07 Y:2023 | 07 | 2023 | Recover waste heat from equipment | $11,731 | $40,000 | |
| UL2304 #06 Y:2023 | 06 | 2023 | Use outside cold water source as a supply of cooling water | $84,650 | $36,445 | |
| UL2304 #05 Y:2023 | 05 | 2023 | Lower temperature during the winter season and vice-versa | $5,246 | $1,300 | |
| UL2304 #04 Y:2023 | 04 | 2023 | Use solar heat to make electricty | $8,501 | $89,882 | |
| UL2304 #03 Y:2023 | 03 | 2023 | Use adjustable frequency drive or multiple speed motors on existing system | $30,148 | $36,675 | |
| UL2304 #02 Y:2023 | 02 | 2023 | Optimize plant power factor | $294,679 | $268,088 | |
| UL2304 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $96,568 | $26,328 |