Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

34

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Arboreta and botanical or zoological gardens
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LS1023 #06 Y:2022 Use solar heat to make electricty $28,932 $231,000
LS1023 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $2,524 $3,046
LS1023 #04 Y:2022 Install occupancy sensors $763 $500
LS1023 #03 Y:2022 Use properly designed and sized hvac equipment $2,701 $900
LS1023 #02 Y:2022 Install timers on light switches in little used areas $1,745 $400
LS1023 #01 Y:2022 Install timers and/or thermostats $2,934 $300
MUCM03 #04 Y:2022 Close holes and openings in building such as broken windows $289 $21
MUCM03 #03 Y:2022 Install occupancy sensors $84 $38
MUCM03 #02 Y:2022 Reduce illumination to minimum necessary levels $52 -
MUCM03 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $1,067 $232
MUCM02 #08 Y:2022 Close holes and openings in building such as broken windows $406 $140
MUCM02 #07 Y:2022 Ventilation system to shut off when room is not in use $663 -
MUCM02 #06 Y:2022 Install timers and/or thermostats $1,592 $950
MUCM02 #05 Y:2022 Maintain machines to reduce leaks $73 $20
MUCM02 #04 Y:2022 Insulate bare equipment $1,179 $580
MUCM02 #03 Y:2022 Reduce illumination to minimum necessary levels $147 -
MUCM02 #02 Y:2022 Utilize higher efficiency lamps and/or ballasts $6,230 $1,776
MUCM02 #01 Y:2022 Turn off equipment when not in use $465 $240
LS0003 #06 Y:2017 Modify facility to avoid excess maintenance costs $1,200 -
LS0003 #05 Y:2017 Insulate bare equipment $12,478 -