Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

130

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Groceries and related products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LT8448 #05 Y:2026 Use solar heat to make electricty $556,491 $7,323,896
LT8448 #04 Y:2026 Install vinyl strip / high speed / air curtain doors $23,347 $8,904
LT8448 #03 Y:2026 Utilize higher efficiency lamps and/or ballasts $3,744 $7,812
LT8448 #02 Y:2026 Reduce the pressure of compressed air to the minimum required $1,180 -
LT8448 #01 Y:2026 Modify refrigeration system to operate at a lower pressure $59,468 $219,165
MI0461 #05 Y:2025 Replace existing hvac unit with high efficiency model $6,646 $33,112
MI0461 #04 Y:2025 Turn off equipment during breaks, reduce operating time $3,684 $2,240
MI0461 #03 Y:2025 Lower temperature during the winter season and vice-versa $4,724 $1,840
MI0461 #02 Y:2025 Reschedule plant operations or reduce load to avoid peaks $4,685 -
MI0461 #01 Y:2025 Recharge batteries on during off-peak demand periods $7,156 -
NL0109 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $400 $1,000
NL0109 #04 Y:2025 Utilize energy-efficient belts and other improved mechanisms $1,783 $2,080
NL0109 #03 Y:2025 Apply for tax-free status for energy purchases $4,510 $2,000
NL0109 #02 Y:2025 Use flow control valves on equipment to optimize water use $12,694 $500
NL0109 #01 Y:2025 Replace existing chiller with high efficiency model $45,070 $240,000
MZ1000 #06 Y:2023 Lower temperature during the winter season and vice-versa $7,061 $1,100
MZ1000 #05 Y:2023 Install or upgrade insulation on hvac distribution systems $2,995 $2,131
MZ1000 #04 Y:2023 Use properly designed and sized hvac equipment $2,463 $900
MZ1000 #03 Y:2023 Install occupancy sensors $269 $560
MZ1000 #02 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $66,389 $51,304