Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

740

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Manufacturing industries, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MA0532 #07 Y:2003 Turn off equipment when not in use $1,580 -
MA0532 #06 Y:2003 Conserve energy by efficient use of vending machines $1,627 $1,845
MA0532 #05 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $2,385 $4,400
MA0532 #04 Y:2003 Use adjustable frequency drive or multiple speed motors on existing system $3,606 $4,400
MA0532 #03 Y:2003 Turn off equipment when not in use $3,833 -
MA0532 #02 Y:2003 Use flue gases to heat process or service water $38,956 $84,895
MA0532 #01 Y:2003 Turn off equipment when not in use $67,039 $7,300
UD0666 #16 Y:2002 Make a practice of turning off lights when not needed $175 -
UD0666 #15 Y:2002 Utilize higher efficiency lamps and/or ballasts $255 $720
UD0666 #14 Y:2002 Install timers on light switches in little used areas $635 $150
UD0666 #13 Y:2002 Disconnect ballasts $740 $100
UD0666 #12 Y:2002 Disconnect ballasts $810 -
UD0666 #11 Y:2002 Turn off equipment during breaks, reduce operating time $835 $1,700
UD0666 #10 Y:2002 Utilize higher efficiency lamps and/or ballasts $1,000 $2,020
UD0666 #09 Y:2002 Reduce the pressure of compressed air to the minimum required $2,000 -
UD0666 #08 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $2,266 $8,500
UD0666 #07 Y:2002 Insulate bare equipment $3,082 -
UD0666 #06 Y:2002 Turn off equipment during breaks, reduce operating time $3,247 $325
UD0666 #05 Y:2002 Turn off equipment during breaks, reduce operating time $3,885 -
UD0666 #04 Y:2002 Reduce the pressure of compressed air to the minimum required $5,180 -