Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

138

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Linoleum, asphalted-felt-base, and other hard surface floor coverings, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0438 #14 Y:2013 Utilize higher efficiency lamps and/or ballasts $674 $550
BD0438 #13 Y:2013 Replace obsolete burners with more efficient ones $10,546 $30,000
BD0438 #12 Y:2013 Reduce the pressure of compressed air to the minimum required $14,591 $25
BD0438 #11 Y:2013 Direct warmest air to combustion intake $14,811 $30,000
BD0438 #10 Y:2013 Utilize higher efficiency lamps and/or ballasts $17,975 $34,500
BD0438 #09 Y:2013 Analyze flue gas for proper air/fuel ratio $27,466 $20,000
BD0438 #08 Y:2013 Reduce excessive boiler blowdown $19,230 $25,000
BD0438 #07 Y:2013 Repair or replace steam traps $42,432 $1,600
BD0438 #06 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $46,324 $10,000
BD0438 #05 Y:2013 Eliminate or reduce compressed air usage $47,432 $30
BD0438 #04 Y:2013 Replace obsolete burners with more efficient ones $52,832 $150,000
BD0438 #03 Y:2013 Use most efficient type of electric motors $63,332 $57,300
BD0438 #02 Y:2013 Replace fossil fuel equipment with electrical equipment $77,861 $384,000
BD0438 #01 Y:2013 Use / purchase optimum sized compressor $257,500 $315,000
UA0101 #06 Y:2013 Replace boiler $14,175 $112,000
UA0101 #05 Y:2013 Use photocell controls $580 $251
UA0101 #04 Y:2013 Minimize water usage $20,266 $8,192
UA0101 #03 Y:2013 Turn off equipment during breaks, reduce operating time $5,670 $80
UA0101 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $14,664 $7,400
UA0101 #01 Y:2013 Install timers and/or thermostats $16,195 $150