Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

356

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Signs and advertising specialties
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UM0069 #03 Y:1996 Improve air circulation with destratification fans / other methods $631 $1,600
UM0069 #02 Y:1996 Insulate glazing, walls, ceilings, and roofs $285 $4,700
UM0069 #01 Y:1996 Utilize higher efficiency lamps and/or ballasts $4,104 $11,898
UD0492 #05 Y:1996 Recover waste heat from equipment $14,226 $6,000
UD0492 #04 Y:1996 Utilize higher efficiency lamps and/or ballasts $2,905 $7,030
UD0492 #03 Y:1996 Utilize higher efficiency lamps and/or ballasts $9,723 $24,961
UD0492 #02 Y:1996 Disconnect ballasts $2,618 -
UD0492 #01 Y:1996 Minimize operation of equipment maintained in standby condition $552 -
BD0053 #07 Y:1995 Recover and reuse cooling water $1,645 $2,818
BD0053 #06 Y:1995 Lease / purchase baler; sell cardboard to recycler $7,487 $6,500
BD0053 #05 Y:1995 Install compressor air intakes in coolest locations $482 $750
BD0053 #04 Y:1995 Install occupancy sensors $572 $750
BD0053 #03 Y:1995 Use most efficient type of electric motors $1,102 $2,530
BD0053 #02 Y:1995 Eliminate leaks in inert gas and compressed air lines/ valves $1,149 $1,149
BD0053 #01 Y:1995 Utilize higher efficiency lamps and/or ballasts $1,436 $2,827
OR0248 #06 Y:1995 Optimize plant power factor $4,496 $20,400
OR0248 #05 Y:1995 Recover waste heat from equipment $2,487 $5,740
OR0248 #04 Y:1995 Insulate bare equipment $474 $1,045
OR0248 #03 Y:1995 Insulate bare equipment $1,459 $1,422
OR0248 #02 Y:1995 Use filtration, centrifuging to remove contaminants $8,328 $250