ITAC Assessment: UD0492
ITAC logo
ITAC Assessment: UD0492
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product real estate yard signs
NAICS
n/a
SIC 3993: Signs and Advertising Specialties
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 122,500
ft2
Annual Production 0
units
Production Hrs. Annual 2,800
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $66,390 2,034,877
kWh
Electricity Demand $88,936 7,344
kW-mo/yr
Natural Gas $130,000 30,089
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $30,024 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $27,406

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Administrative Changes Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $552 - - - $552
-
MMBtu
-
02 2.7122: Disconnect ballasts $2,618 - $2,368
72,098
kWh
- - $250
03 2.7142: Utilize higher efficiency lamps and/or ballasts $9,723 $24,961 $3,765
114,889
kWh
$5,958
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,905 $7,030 $1,125
34,291
kWh
$1,780
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $14,226 $6,000 $(-103.0)
(-3,224)
kWh
$(-381.0)
-
kW-mo/yr
$14,710
-
MMBtu
-
TOTAL RECOMMENDED $30,024 $37,991 $7,155
218,054
kWh
$7,357
-
kW-mo/yr
$15,262
-
MMBtu
$250
TOTAL IMPLEMENTED $27,406 $37,991 $4,787
145,956
kWh
$7,357
-
kW-mo/yr
$15,262
-
MMBtu
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs