10
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Instruments for measuring and testing of electricity and electrical signals | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MA0446 #10 Y:1999 | 10 | 1999 | Install compressor air intakes in coolest locations | $638 | $300 | |
| MA0446 #09 Y:1999 | 09 | 1999 | Replace electrically-operated equipment with fossil fuel equipment | $718 | $2,000 | |
| MA0446 #08 Y:1999 | 08 | 1999 | Use adjustable frequency drive or multiple speed motors on existing system | $930 | $4,225 | |
| MA0446 #07 Y:1999 | 07 | 1999 | Air condition only space necessary | $1,137 | $2,670 | |
| MA0446 #06 Y:1999 | 06 | 1999 | Ventilation system to shut off when room is not in use | $2,849 | - | |
| MA0446 #05 Y:1999 | 05 | 1999 | Utilize higher efficiency lamps and/or ballasts | $3,234 | $12,279 | |
| MA0446 #04 Y:1999 | 04 | 1999 | Use adjustable frequency drive or multiple speed motors on existing system | $9,237 | $3,575 | |
| MA0446 #03 Y:1999 | 03 | 1999 | Replace city water with recycled water via cooling tower | $14,463 | $20,800 | |
| MA0446 #02 Y:1999 | 02 | 1999 | Insulate bare equipment | $30,690 | $820 | |
| MA0446 #01 Y:1999 | 01 | 1999 | Replace electrically-operated equipment with fossil fuel equipment | $30,897 | $36,700 |