Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

9,930

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Transportation equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MZ0388 #07 Y:2025 Lower temperature during the winter season and vice-versa $3,985 $1,400
MZ0388 #06 Y:2025 Install occupancy sensors $410 $1,100
MZ0388 #05 Y:2025 Use or replace with energy efficient substitutes $106,061 $925,500
MZ0388 #04 Y:2025 Use solar heat to make electricty $54,550 $446,580
MZ0388 #03 Y:2025 Eliminate or reduce compressed air usage $3,133 $13,126
MZ0388 #02 Y:2025 Recover waste heat from equipment $4,616 $10,320
MZ0388 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,848 $6,300
DL0268 #11 Y:2025 Use optimum thickness insulation $1,331 $30,000
DL0268 #10 Y:2025 Install vinyl strip / high speed / air curtain doors $3,280 $33,000
DL0268 #09 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,463 $25,000
DL0268 #08 Y:2025 Improve air circulation with destratification fans / other methods $1,003 $8,640
DL0268 #07 Y:2025 Install timers and/or thermostats $192 $280
DL0268 #06 Y:2025 Install timers and/or thermostats $7,041 $6,750
DL0268 #05 Y:2025 Recover waste heat from equipment $670 $2,000
DL0268 #04 Y:2025 Turn off equipment during breaks, reduce operating time $1,672 -
DL0268 #03 Y:2025 Clean and maintain refrigerant condensers and towers $879 -
DL0268 #02 Y:2025 Install timers and/or thermostats $808 -
DL0268 #01 Y:2025 Turn off equipment when not in use $1,184 -
UF0639 #10 Y:2025 Replace existing equipment with more suitable substitutes $20,000 $3,560
UF0639 #09 Y:2025 Improve space comfort conditioning $80,680 $22,260