Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

14

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Semiconductors and related devices
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MI0050 #06 Y:2002 Upgrade controls on compressors $2,860 $1,338
MI0050 #05 Y:2002 Reduce the pressure of compressed air to the minimum required $2,880 $2
MI0050 #04 Y:2002 Install spectral reflectors / delamp $10,046 $21,150
MI0050 #03 Y:2002 Install or upgrade insulation on hvac distribution systems $53,360 $5,000
MI0050 #02 Y:2002 Replace existing hvac unit with high efficiency model $95,397 $66,000
MI0050 #01 Y:2002 Replace existing equipment with more suitable substitutes $173,081 $82,800
UF0303 #08 Y:2002 Pay utility bills on time $7,393 -
UF0303 #07 Y:2002 Change rate schedules or other changes in utility service $89,796 -
UF0303 #06 Y:2002 Use evaporation to concentrate material $13,509 $4,995
UF0303 #05 Y:2002 Insulate glazing, walls, ceilings, and roofs $138,554 $77,000
UF0303 #04 Y:2002 Use adjustable frequency drive or multiple speed motors on existing system $10,157 $29,907
UF0303 #03 Y:2002 Optimize plant power factor $5,340 $24,092
UF0303 #02 Y:2002 Install timers on light switches in little used areas $6,229 $358
UF0303 #01 Y:2002 Size electric motors for peak operating efficiency $23,984 $1,074