Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,316

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous industrial and commercial
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2510 #04 Y:2025 Install occupancy sensors $1,506 $185
UL2510 #03 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $4,413 $9,750
UL2510 #02 Y:2025 Use solar heat to make electricty $71,181 $417,175
UL2510 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,769 $3,240
UD1117 #06 Y:2025 Recover waste heat from equipment $1,029 $4,975
UD1117 #05 Y:2025 Reschedule plant operations or reduce load to avoid peaks $8,113 -
UD1117 #04 Y:2025 Optimize plant power factor $13,183 $15,550
UD1117 #03 Y:2025 Centralize control of exhaust fans to ensure their shutdown, or establish program to ensure manual shutdown $2,839 $947
UD1117 #02 Y:2025 Reduce the pressure of compressed air to the minimum required $2,150 -
UD1117 #01 Y:2025 Install compressor air intakes in coolest locations $3,656 $1,015
MS0450 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $3,775 $1,740
MS0450 #05 Y:2025 Use / purchase optimum sized compressor $1,199 $5,414
MS0450 #04 Y:2025 Install shelves / racks to utilize unused space $14,625 $43,769
MS0450 #03 Y:2025 Re-arrange equipment layout to reduce handling costs $9,485 -
MS0450 #02 Y:2025 Use or replace with energy efficient substitutes $44,435 $122,808
MS0450 #01 Y:2025 Air condition only space necessary $16,450 $19,723
UU0275 #06 Y:2025 Increase efficiency of trucks $4,820 $8,740
UU0275 #05 Y:2025 Install occupancy sensors $12,307 $10,880
UU0275 #04 Y:2025 Eliminate or reduce compressed air usage $2,066 $2,066
UU0275 #03 Y:2025 Use automatic flow control $1,516 $5,258