Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

2,340

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous industrial and commercial
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0588 #12 Y:2025 Use solar heat to make electricty $50,535 $467,049
SU0588 #11 Y:2025 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $377 $1,928
SU0588 #10 Y:2025 Install back-up equipment $30,784 $86,000
SU0588 #09 Y:2025 Install occupancy sensors $1,049 $2,285
SU0588 #08 Y:2025 Conserve energy by efficient use of vending machines $232 $368
SU0588 #07 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,289 $1,441
SU0588 #06 Y:2025 Use or replace with energy efficient substitutes $422 $461
SU0588 #05 Y:2025 Install compressor air intakes in coolest locations $559 $471
SU0588 #04 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,258 $209
SU0588 #03 Y:2025 Use or replace with energy efficient substitutes $914 $74
SU0588 #02 Y:2025 Reduce space conditioning during non-working hours $775 -
SU0588 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $2,279 -
LS2520 #07 Y:2025 Replace existing equipment with more suitable substitutes $81,909 $1,200,000
LS2520 #06 Y:2025 Use solar heat to make electricty $45,568 $526,500
LS2520 #05 Y:2025 Replace fossil fuel equipment with electrical equipment $87,705 $481,830
LS2520 #04 Y:2025 Clean or color roof to reduce solar load $6,832 $34,161
LS2520 #03 Y:2025 Upgrade controls on compressors $5,065 $12,500
LS2520 #02 Y:2025 Install sub-metering equipment $3,354 $3,000
LS2520 #01 Y:2025 Install timers and/or thermostats $13,009 $225
UU0280 #05 Y:2025 Use solar heat to make electricty $27,818 $406,200