131
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| BD0491 #11 Y:2016 | 11 | 2016 | Utilize higher efficiency lamps and/or ballasts | $209 | $190 | |
| BD0491 #10 Y:2016 | 10 | 2016 | Insulate bare equipment | $601 | $1,800 | |
| BD0491 #09 Y:2016 | 09 | 2016 | Install occupancy sensors | $778 | $600 | |
| BD0491 #08 Y:2016 | 08 | 2016 | Install compressor air intakes in coolest locations | $1,064 | $500 | |
| BD0491 #07 Y:2016 | 07 | 2016 | Utilize energy-efficient belts and other improved mechanisms | $1,131 | $2,800 | |
| BD0491 #06 Y:2016 | 06 | 2016 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,427 | $1,000 | |
| BD0491 #05 Y:2016 | 05 | 2016 | Utilize controls to operate equipment only when needed | $1,456 | $2,700 | |
| BD0491 #04 Y:2016 | 04 | 2016 | Reduce the pressure of compressed air to the minimum required | $1,994 | $20 | |
| BD0491 #03 Y:2016 | 03 | 2016 | Use waste heat from hot flue gases to preheat | $3,307 | $7,500 | |
| BD0491 #02 Y:2016 | 02 | 2016 | Utilize higher efficiency lamps and/or ballasts | $6,310 | $30,685 | |
| BD0491 #01 Y:2016 | 01 | 2016 | Use most efficient type of electric motors | $5,795 | $6,550 | |
| BD0422 #09 Y:2012 | 09 | 2012 | Convert to high volume low pressure (hvlp) paint guns | $17,739 | $4,600 | |
| BD0422 #08 Y:2012 | 08 | 2012 | Install compressor air intakes in coolest locations | $530 | $500 | |
| BD0422 #07 Y:2012 | 07 | 2012 | Recover waste heat from equipment | $610 | $1,000 | |
| BD0422 #06 Y:2012 | 06 | 2012 | Use synthetic lubricant | $633 | $300 | |
| BD0422 #05 Y:2012 | 05 | 2012 | Reduce the pressure of compressed air to the minimum required | $1,187 | $25 | |
| BD0422 #04 Y:2012 | 04 | 2012 | Install occupancy sensors | $2,518 | $3,225 | |
| BD0422 #03 Y:2012 | 03 | 2012 | Use synthetic lubricant | $4,219 | $4,219 | |
| BD0422 #02 Y:2012 | 02 | 2012 | Use radiant heater for spot heating | $11,658 | $28,800 | |
| BD0422 #01 Y:2012 | 01 | 2012 | Reschedule plant operations or reduce load to avoid peaks | $16,352 | $400 |