Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,612

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Special industry machinery, except metalworking
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SJ0049 #07 Y:2026 Use solar heat to make electricty $97,782 $111,738
SJ0049 #06 Y:2026 Lower temperature during the winter season and vice-versa $5,009 -
SJ0049 #05 Y:2026 Use or replace with energy efficient substitutes $6,174 $26,353
SJ0049 #04 Y:2026 Eliminate or reduce compressed air usage $4,177 -
SJ0049 #03 Y:2026 Isolate hot or cold equipment $7,402 $3,682
SJ0049 #02 Y:2026 Recover waste heat from equipment $862 $2,033
SJ0049 #01 Y:2026 Utilize higher efficiency lamps and/or ballasts $15,275 $15,290
MU0087 #13 Y:2026 Close holes and openings in building such as broken windows $311 $91
MU0087 #12 Y:2026 Lower temperature during the winter season and vice-versa $160 -
MU0087 #11 Y:2026 Utilize higher efficiency lamps and/or ballasts $1,384 $248
MU0087 #10 Y:2026 Utilize higher efficiency lamps and/or ballasts $49 $176
MU0087 #09 Y:2026 Use photocell controls $237 $360
MU0087 #08 Y:2026 Make a practice of turning off lights when not needed $35 $84
MU0087 #07 Y:2026 Turn off equipment when not in use $3,495 -
MU0087 #06 Y:2026 Eliminate leaks in inert gas and compressed air lines/ valves $896 -
MU0087 #05 Y:2026 Use or replace with energy efficient substitutes $75 $650
MU0087 #04 Y:2026 Optimize plant power factor $5,236 $38,117
MU0087 #03 Y:2026 Recharge batteries on during off-peak demand periods $253 $345
MU0087 #02 Y:2026 Install occupancy sensors $5,702 $1,176
MU0087 #01 Y:2026 Install timers and/or thermostats $47,502 $85