Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

228

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Machine tools, metal forming types
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WM0187 #06 Y:2022 Reduce the pressure of compressed air to the minimum required $533 -
WM0187 #05 Y:2022 Utilize higher efficiency lamps and/or ballasts $668 $980
WM0187 #04 Y:2022 Utilize energy-efficient belts and other improved mechanisms $984 $480
WM0187 #03 Y:2022 Install occupancy sensors $1,137 $1,079
WM0187 #02 Y:2022 Use synthetic lubricant $1,264 $2,400
WM0187 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,818 $3,500
SU0473 #09 Y:2018 Utilize higher efficiency lamps and/or ballasts $11,728 $30,695
SU0473 #08 Y:2018 Conserve energy by efficient use of vending machines $167 $412
SU0473 #07 Y:2018 Install compressor air intakes in coolest locations $1,625 $4,006
SU0473 #06 Y:2018 Utilize higher efficiency lamps and/or ballasts $192 $290
SU0473 #05 Y:2018 Reduce ventilation air $660 $925
SU0473 #04 Y:2018 Use photocell controls $916 $470
SU0473 #03 Y:2018 Install vinyl strip / high speed / air curtain doors $519 $200
SU0473 #02 Y:2018 Use synthetic lubricant $11,804 -
SU0473 #01 Y:2018 Reduce the pressure of compressed air to the minimum required $2,790 -
UD0982 #13 Y:2017 Install equipment (eg compactor) to reduce disposal costs $13,372 $10,000
UD0982 #12 Y:2017 Add area lighting switches $675 $500
UD0982 #11 Y:2017 Install occupancy sensors $5,167 $1,500
UD0982 #10 Y:2017 Make a practice of turning off lights when not needed $5,443 -
UD0982 #09 Y:2017 Utilize higher efficiency lamps and/or ballasts $46,311 $113,386