Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

53

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Machine tools, metal forming types
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0982 #13 Y:2017 Install equipment (eg compactor) to reduce disposal costs $13,372 $10,000
UD0982 #12 Y:2017 Add area lighting switches $675 $500
UD0982 #11 Y:2017 Install occupancy sensors $5,167 $1,500
UD0982 #10 Y:2017 Make a practice of turning off lights when not needed $5,443 -
UD0982 #09 Y:2017 Utilize higher efficiency lamps and/or ballasts $46,311 $113,386
UD0982 #08 Y:2017 Cover open tanks $700 $460
UD0982 #07 Y:2017 Cover open tanks $268 -
UD0982 #06 Y:2017 Eliminate or reduce compressed air usage $2,208 $3,500
UD0982 #05 Y:2017 Install compressor air intakes in coolest locations $6,501 $8,000
UD0982 #04 Y:2017 Eliminate or reduce compressed air usage $9,415 -
UD0982 #03 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $12,010 $500
UD0982 #02 Y:2017 Reduce ventilation air $9,420 $3,000
UD0982 #01 Y:2017 Utilize energy-efficient belts and other improved mechanisms $21,886 -
UD0960 #14 Y:2016 Utilize higher efficiency lamps and/or ballasts $3,599 $9,362
UD0960 #13 Y:2016 Install occupancy sensors $6,486 $9,108
UD0960 #12 Y:2016 Utilize higher efficiency lamps and/or ballasts $26,179 $97,386
UD0960 #11 Y:2016 Use minimum steam operating pressure $826 -
UD0960 #10 Y:2016 Analyze flue gas for proper air/fuel ratio $2,121 -
UD0960 #09 Y:2016 Reduce excessive boiler blowdown $5,234 $7,500
UD0960 #08 Y:2016 Use fossil fuel powered generator during peak demand periods $11,351 $10,000