| UD0982 #13 Y:2017 | 13 | 2017 | Install equipment (eg compactor) to reduce disposal costs | $13,372 | $10,000 | |
| UD0982 #12 Y:2017 | 12 | 2017 | Add area lighting switches | $675 | $500 | |
| UD0982 #11 Y:2017 | 11 | 2017 | Install occupancy sensors | $5,167 | $1,500 | |
| UD0982 #10 Y:2017 | 10 | 2017 | Make a practice of turning off lights when not needed | $5,443 | - | |
| UD0982 #09 Y:2017 | 09 | 2017 | Utilize higher efficiency lamps and/or ballasts | $46,311 | $113,386 | |
| UD0982 #08 Y:2017 | 08 | 2017 | Cover open tanks | $700 | $460 | |
| UD0982 #07 Y:2017 | 07 | 2017 | Cover open tanks | $268 | - | |
| UD0982 #06 Y:2017 | 06 | 2017 | Eliminate or reduce compressed air usage | $2,208 | $3,500 | |
| UD0982 #05 Y:2017 | 05 | 2017 | Install compressor air intakes in coolest locations | $6,501 | $8,000 | |
| UD0982 #04 Y:2017 | 04 | 2017 | Eliminate or reduce compressed air usage | $9,415 | - | |
| UD0982 #03 Y:2017 | 03 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $12,010 | $500 | |
| UD0982 #02 Y:2017 | 02 | 2017 | Reduce ventilation air | $9,420 | $3,000 | |
| UD0982 #01 Y:2017 | 01 | 2017 | Utilize energy-efficient belts and other improved mechanisms | $21,886 | - | |
| UD0960 #14 Y:2016 | 14 | 2016 | Utilize higher efficiency lamps and/or ballasts | $3,599 | $9,362 | |
| UD0960 #13 Y:2016 | 13 | 2016 | Install occupancy sensors | $6,486 | $9,108 | |
| UD0960 #12 Y:2016 | 12 | 2016 | Utilize higher efficiency lamps and/or ballasts | $26,179 | $97,386 | |
| UD0960 #11 Y:2016 | 11 | 2016 | Use minimum steam operating pressure | $826 | - | |
| UD0960 #10 Y:2016 | 10 | 2016 | Analyze flue gas for proper air/fuel ratio | $2,121 | - | |
| UD0960 #09 Y:2016 | 09 | 2016 | Reduce excessive boiler blowdown | $5,234 | $7,500 | |
| UD0960 #08 Y:2016 | 08 | 2016 | Use fossil fuel powered generator during peak demand periods | $11,351 | $10,000 |