Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

270

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Machine tools, metal cutting types
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SD0678 #07 Y:2025 Install occupancy sensors $843 $2,979
SD0678 #06 Y:2025 Replace fossil fuel equipment with electrical equipment $14,843 $23,800
SD0678 #05 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,200 $3,396
SD0678 #04 Y:2025 Use or replace with energy efficient substitutes $2,339 $25,895
SD0678 #03 Y:2025 Use properly designed and sized hvac equipment $50,863 $545,300
SD0678 #02 Y:2025 Utilize higher efficiency lamps and/or ballasts $947 $3,752
SD0678 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $156 $424
WM0213 #06 Y:2023 Install compressor air intakes in coolest locations $463 $1,730
WM0213 #05 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $1,049 $125
WM0213 #04 Y:2023 Recharge batteries on during off-peak demand periods $2,240 $2,590
WM0213 #03 Y:2023 Install occupancy sensors $2,965 $267
WM0213 #02 Y:2023 Use radiant heater for spot heating $3,521 $16,500
WM0213 #01 Y:2023 Insulate glazing, walls, ceilings, and roofs $10,341 $20,389
MZ0307 #03 Y:2021 Eliminate leaks in inert gas and compressed air lines/ valves $809 $1,130
MZ0307 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $3,100 $6,233
MZ0307 #01 Y:2021 Reschedule plant operations or reduce load to avoid peaks $6,351 $1,250
MZ0202 #08 Y:2015 Use most efficient type of electric motors $6,722 $7,341
MZ0202 #07 Y:2015 Condense operation into one building $7,503 -
MZ0202 #06 Y:2015 Condense operation into one building $3,585 -
MZ0202 #05 Y:2015 Upgrade controls on compressors $9,678 $45,000