270
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Machine tools, metal cutting types | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
SD0678 #07 Y:2025 | 07 | 2025 | Install occupancy sensors | $843 | $2,979 |
n/a
|
SD0678 #06 Y:2025 | 06 | 2025 | Replace fossil fuel equipment with electrical equipment | $14,843 | $23,800 |
n/a
|
SD0678 #05 Y:2025 | 05 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,200 | $3,396 |
n/a
|
SD0678 #04 Y:2025 | 04 | 2025 | Use or replace with energy efficient substitutes | $2,339 | $25,895 |
n/a
|
SD0678 #03 Y:2025 | 03 | 2025 | Use properly designed and sized hvac equipment | $50,863 | $545,300 |
n/a
|
SD0678 #02 Y:2025 | 02 | 2025 | Utilize higher efficiency lamps and/or ballasts | $947 | $3,752 |
n/a
|
SD0678 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $156 | $424 |
n/a
|
WM0213 #06 Y:2023 | 06 | 2023 | Install compressor air intakes in coolest locations | $463 | $1,730 | |
WM0213 #05 Y:2023 | 05 | 2023 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,049 | $125 | |
WM0213 #04 Y:2023 | 04 | 2023 | Recharge batteries on during off-peak demand periods | $2,240 | $2,590 | |
WM0213 #03 Y:2023 | 03 | 2023 | Install occupancy sensors | $2,965 | $267 | |
WM0213 #02 Y:2023 | 02 | 2023 | Use radiant heater for spot heating | $3,521 | $16,500 | |
WM0213 #01 Y:2023 | 01 | 2023 | Insulate glazing, walls, ceilings, and roofs | $10,341 | $20,389 | |
MZ0307 #03 Y:2021 | 03 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $809 | $1,130 | |
MZ0307 #02 Y:2021 | 02 | 2021 | Utilize higher efficiency lamps and/or ballasts | $3,100 | $6,233 | |
MZ0307 #01 Y:2021 | 01 | 2021 | Reschedule plant operations or reduce load to avoid peaks | $6,351 | $1,250 | |
MZ0202 #08 Y:2015 | 08 | 2015 | Use most efficient type of electric motors | $6,722 | $7,341 | |
MZ0202 #07 Y:2015 | 07 | 2015 | Condense operation into one building | $7,503 | - | |
MZ0202 #06 Y:2015 | 06 | 2015 | Condense operation into one building | $3,585 | - | |
MZ0202 #05 Y:2015 | 05 | 2015 | Upgrade controls on compressors | $9,678 | $45,000 |