ITAC Assessment: BD0407
ITAC logo
ITAC Assessment: BD0407
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2012
Principal Product industrial machines
NAICS 333517: Machine Tool Manufacturing
SIC 3541: Machine Tools, Metal Cutting Types
Sales Range $10
M
to 50
M
# of Employees 65
Plant Area 170,000
ft2
Annual Production 0
units
Production Hrs. Annual 2,730
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,818 875,841
kWh
Electricity Demand $21,329 3,643
kW-mo/yr
Electricity Fees $12,642 -
Natural Gas $42,378 4,850
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $13,413 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,803

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,152 $4,550 $3,257
34,881
kWh
$895
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,651 $2,474 $2,862
30,638
kWh
$789
-
kW-mo/yr
03 2.7135: Install occupancy sensors $2,441 $1,125 $1,830
19,593
kWh
$611
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $1,629 $10 $1,277
13,675
kWh
$352
-
kW-mo/yr
05 2.4133: Use most efficient type of electric motors $1,259 $1,420 $987
10,566
kWh
$272
-
kW-mo/yr
06 2.7134: Use photocell controls $281 $300 $203
2,171
kWh
$78
-
kW-mo/yr
TOTAL RECOMMENDED $13,413 $9,879 $10,416
111,524
kWh
$2,997
-
kW-mo/yr
TOTAL IMPLEMENTED $7,803 $7,024 $6,119
65,519
kWh
$1,684
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs