Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

25

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Elevators and moving stairways
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
HO0230 #25 Y:2000 Reduce scrap production $600 $5,000
HO0230 #24 Y:2000 Separate and recycle scrap metal to foundry or for sale $15,600 $500
HO0230 #23 Y:2000 Move product using mechanical means $3,900 $5,000
HO0230 #22 Y:2000 Improve handling practices $1,950 $100
HO0230 #21 Y:2000 Replace existing equipment with more suitable substitutes $24,000 $4,000
HO0230 #20 Y:2000 Develop standard operating procedures $8,520 $8,000
HO0230 #19 Y:2000 Add equipment/ operators to reduce production bottleneck $675 $475
HO0230 #18 Y:2000 Eliminate old stock and modify inventory control $540 $395
HO0230 #17 Y:2000 Begin a practice of predictive / preventative maintenance $50,000 $2,300
HO0230 #16 Y:2000 Begin a practice of predictive / preventative maintenance $25,000 $1,300
HO0230 #15 Y:2000 Improve space comfort conditioning $1,440 $800
HO0230 #14 Y:2000 Add equipment/ operators to reduce production bottleneck $127,605 $8,400
HO0230 #13 Y:2000 Install back-up equipment $18,465 $7,000
HO0230 #12 Y:2000 Install shrouding on machines to prevent splashing $2,340 $2,000
HO0230 #11 Y:2000 Not found $5,000 $8,600
HO0230 #10 Y:2000 Re-arrange equipment layout to reduce labor costs $3,900 $600
HO0230 #09 Y:2000 Improve space comfort conditioning $840 $270
HO0230 #08 Y:2000 Improve space comfort conditioning $1,440 $744
HO0230 #07 Y:2000 Install vinyl strip / high speed / air curtain doors $5,190 $750
HO0230 #06 Y:2000 Establish a preventative maintenance program $22,230 $4,000