Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

852

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Construction machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
WV0683 #07 Y:2025 Reduce the pressure of compressed air to the minimum required $209 $60
WV0683 #06 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $703 $188
WV0683 #05 Y:2025 Eliminate or reduce compressed air usage $947 $500
WV0683 #04 Y:2025 Recover heat from exhausted steam, hot air or hot water $1,279 $3,050
WV0683 #03 Y:2025 Upgrade controls on compressors $1,332 $985
WV0683 #02 Y:2025 Minimize use of outside make-up air for ventilation except when used for economizer cycle $3,650 $1,300
WV0683 #01 Y:2025 Install occupancy sensors $4,707 $2,420
WM0244 #04 Y:2025 Utilize higher efficiency lamps and/or ballasts $1,099 $1,720
WM0244 #03 Y:2025 Install compressor air intakes in coolest locations $1,421 $2,740
WM0244 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,400 $4,125
WM0244 #01 Y:2025 Reschedule plant operations or reduce load to avoid peaks $22,838 -
NL0108 #04 Y:2025 Install occupancy sensors $686 $1,621
NL0108 #03 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $1,935 $695
NL0108 #02 Y:2025 Upgrade obsolete equipment $93,844 $220,000
NL0108 #01 Y:2025 Add equipment/ operators to reduce production bottleneck $510,000 $2,500,000
NL0095 #06 Y:2024 Eliminate or reduce compressed air usage $647 $2,000
NL0095 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $652 $373
NL0095 #04 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $1,285 $1,500
NL0095 #03 Y:2024 Apply for tax-free status for energy purchases $11,145 $2,000
NL0095 #02 Y:2024 Recharge batteries on during off-peak demand periods $14,437 $500