Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

65

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Farm and garden machinery and equipment
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
BD0494 #10 Y:2016 Install compressor air intakes in coolest locations $260 $600
BD0494 #09 Y:2016 Utilize energy-efficient belts and other improved mechanisms $294 $550
BD0494 #08 Y:2016 Utilize higher efficiency lamps and/or ballasts $350 $300
BD0494 #07 Y:2016 Reduce the pressure of compressed air to the minimum required $803 $21
BD0494 #06 Y:2016 Utilize higher efficiency lamps and/or ballasts $1,456 $3,960
BD0494 #05 Y:2016 Use most efficient type of electric motors $1,978 $4,040
BD0494 #04 Y:2016 Use photocell controls $2,112 $3,000
BD0494 #03 Y:2016 Install occupancy sensors $2,169 $1,950
BD0494 #02 Y:2016 Use radiant heater for spot heating $5,446 $12,000
BD0494 #01 Y:2016 Replace obsolete burners with more efficient ones $6,894 $18,000
BD0482 #07 Y:2016 Convert to electrostatic powder coating $186,807 $160,000
BD0482 #06 Y:2016 Utilize higher efficiency lamps and/or ballasts $152 $184
BD0482 #05 Y:2016 Use most efficient type of electric motors $507 $600
BD0482 #04 Y:2016 Install occupancy sensors $738 $825
BD0482 #03 Y:2016 Preheat combustion air with waste heat $1,149 $2,000
BD0482 #02 Y:2016 Utilize daylight whenever possible in lieu of artificial light $2,096 $840
BD0482 #01 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,155 $9,455
BD0402 #08 Y:2011 Use photocell controls $709 $800
BD0402 #07 Y:2011 Use most efficient type of electric motors $757 $1,700
BD0402 #06 Y:2011 Eliminate leaks in inert gas and compressed air lines/ valves $923 $100