673
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Miscellaneous fabricated wire products | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| MS0468 #06 Y:2026 | 06 | 2026 | Replace dc equipment with ac equipment | $2,100 | $26,537 |
n/a
|
| MS0468 #05 Y:2026 | 05 | 2026 | Install timers and/or thermostats | $34,362 | $147,620 |
n/a
|
| MS0468 #04 Y:2026 | 04 | 2026 | Purchase equipment instead of leasing | $607,068 | $889,000 |
n/a
|
| MS0468 #03 Y:2026 | 03 | 2026 | Lower temperature during the winter season and vice-versa | $24,902 | - |
n/a
|
| MS0468 #02 Y:2026 | 02 | 2026 | Reduce the pressure of compressed air to the minimum required | $13,520 | - |
n/a
|
| MS0468 #01 Y:2026 | 01 | 2026 | Improve air circulation with destratification fans / other methods | $29,766 | $61,672 |
n/a
|
| MI0466 #06 Y:2025 | 06 | 2025 | Utilize higher efficiency lamps and/or ballasts | $1,327 | $3,414 |
n/a
|
| MI0466 #05 Y:2025 | 05 | 2025 | Optimize plant power factor | $8,024 | $18,830 |
n/a
|
| MI0466 #04 Y:2025 | 04 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $4,309 | $4,560 |
n/a
|
| MI0466 #03 Y:2025 | 03 | 2025 | Use solar heat to make electricty | $58,107 | $6,400 |
n/a
|
| MI0466 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $10,332 | $1,020 |
n/a
|
| MI0466 #01 Y:2025 | 01 | 2025 | Change rate schedules or other changes in utility service | $1,368 | $100 |
n/a
|
| AM0900 #06 Y:2023 | 06 | 2023 | Recover waste heat from equipment | $29,310 | $69,700 |
n/a
|
| AM0900 #05 Y:2023 | 05 | 2023 | Use synthetic lubricant | $727 | $546 |
n/a
|
| AM0900 #04 Y:2023 | 04 | 2023 | Utilize energy-efficient belts and other improved mechanisms | $1,024 | $546 |
n/a
|
| AM0900 #03 Y:2023 | 03 | 2023 | Reduce the pressure of compressed air to the minimum required | $1,283 | $273 |
n/a
|
| AM0900 #02 Y:2023 | 02 | 2023 | Optimize plant power factor | $19,139 | $30,070 |
n/a
|
| AM0900 #01 Y:2023 | 01 | 2023 | Utilize higher efficiency lamps and/or ballasts | $5,923 | $10,333 |
n/a
|
| UC2310 #13 Y:2023 | 13 | 2023 | Install timers and/or thermostats | $1,947 | $1,980 | |
| UC2310 #12 Y:2023 | 12 | 2023 | Eliminate or reduce compressed air usage | $791 | $1,804 |