Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

661

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Miscellaneous fabricated wire products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0900 #06 Y:2023 Recover waste heat from equipment $29,310 $69,700
AM0900 #05 Y:2023 Use synthetic lubricant $727 $546
AM0900 #04 Y:2023 Utilize energy-efficient belts and other improved mechanisms $1,024 $546
AM0900 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $1,283 $273
AM0900 #02 Y:2023 Optimize plant power factor $19,139 $30,070
AM0900 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $5,923 $10,333
UC2310 #13 Y:2023 Install timers and/or thermostats $1,947 $1,980
UC2310 #12 Y:2023 Eliminate or reduce compressed air usage $791 $1,804
UC2310 #11 Y:2023 Utilize controls to operate equipment only when needed $4,068 $75
UC2310 #10 Y:2023 Reduce the pressure of compressed air to the minimum required $1,459 $150
UC2310 #09 Y:2023 Recover waste heat from equipment $1,865 $5,326
UC2310 #08 Y:2023 Reduce the pressure of compressed air to the minimum required $3,756 $225
UC2310 #07 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $3,607 $1,900
UC2310 #06 Y:2023 Install compressor air intakes in coolest locations $1,547 $1,283
UC2310 #05 Y:2023 Replace existing hvac unit with high efficiency model $6,045 $40,103
UC2310 #04 Y:2023 Use solar heat to make electricty $39,506 $192,621
UC2310 #03 Y:2023 Pay utility bills on time $146 -
UC2310 #02 Y:2023 Change rate schedules or other changes in utility service $6,116 -
UC2310 #01 Y:2023 Apply for tax-free status for energy purchases $4,838 -
MZ0346 #05 Y:2023 Install occupancy sensors $146 $200