Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

399

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Fluid power valves and hose fittings
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UC2511 #09 Y:2025 Replace fossil fuel equipment with electrical equipment $116,730 $360,000
UC2511 #08 Y:2025 Utilize controls to operate equipment only when needed $6,726 $75
UC2511 #07 Y:2025 Use solar heat to make electricty $225,469 $2,423,010
UC2511 #06 Y:2025 Insulate bare equipment $3,267 $2,180
UC2511 #05 Y:2025 Recover waste heat from equipment $22,999 $8,485
UC2511 #04 Y:2025 Use photocell controls $6,789 $14,000
UC2511 #03 Y:2025 Install occupancy sensors $6,520 $10,625
UC2511 #02 Y:2025 Install compressor air intakes in coolest locations $2,290 $2,200
UC2511 #01 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $7,109 $1,474
MZ0377 #08 Y:2025 Eliminate or reduce compressed air usage $1,503 $3,660
MZ0377 #07 Y:2025 Meter recycled water (to reduce sewer charges) $31,698 $9,040
MZ0377 #06 Y:2025 Use or replace with energy efficient substitutes $26,142 $43,500
MZ0377 #05 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $769 $200
MZ0377 #04 Y:2025 Eliminate or reduce compressed air usage $4,340 $2,300
MZ0377 #03 Y:2025 Utilize energy-efficient belts and other improved mechanisms $871 -
MZ0377 #02 Y:2025 Install occupancy sensors $498 $415
MZ0377 #01 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $7,928 $9,400
NL0105 #05 Y:2024 Meter waste water $794 $950
NL0105 #04 Y:2024 Change rate schedules or other changes in utility service $2,197 $40
NL0105 #03 Y:2024 Utilize higher efficiency lamps and/or ballasts $10,009 $9,991