ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UC2511 #09 Y:2025 | 09 | 2025 | Replace fossil fuel equipment with electrical equipment | $116,730 | $360,000 |
n/a
|
UC2511 #08 Y:2025 | 08 | 2025 | Utilize controls to operate equipment only when needed | $6,726 | $75 |
n/a
|
UC2511 #07 Y:2025 | 07 | 2025 | Use solar heat to make electricty | $225,469 | $2,423,010 |
n/a
|
UC2511 #06 Y:2025 | 06 | 2025 | Insulate bare equipment | $3,267 | $2,180 |
n/a
|
UC2511 #05 Y:2025 | 05 | 2025 | Recover waste heat from equipment | $22,999 | $8,485 |
n/a
|
UC2511 #04 Y:2025 | 04 | 2025 | Use photocell controls | $6,789 | $14,000 |
n/a
|
UC2511 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $6,520 | $10,625 |
n/a
|
UC2511 #02 Y:2025 | 02 | 2025 | Install compressor air intakes in coolest locations | $2,290 | $2,200 |
n/a
|
UC2511 #01 Y:2025 | 01 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $7,109 | $1,474 |
n/a
|
MZ0377 #08 Y:2025 | 08 | 2025 | Eliminate or reduce compressed air usage | $1,503 | $3,660 |
n/a
|
MZ0377 #07 Y:2025 | 07 | 2025 | Meter recycled water (to reduce sewer charges) | $31,698 | $9,040 |
n/a
|
MZ0377 #06 Y:2025 | 06 | 2025 | Use or replace with energy efficient substitutes | $26,142 | $43,500 |
n/a
|
MZ0377 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $769 | $200 |
n/a
|
MZ0377 #04 Y:2025 | 04 | 2025 | Eliminate or reduce compressed air usage | $4,340 | $2,300 |
n/a
|
MZ0377 #03 Y:2025 | 03 | 2025 | Utilize energy-efficient belts and other improved mechanisms | $871 | - |
n/a
|
MZ0377 #02 Y:2025 | 02 | 2025 | Install occupancy sensors | $498 | $415 |
n/a
|
MZ0377 #01 Y:2025 | 01 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $7,928 | $9,400 |
n/a
|
NL0105 #05 Y:2024 | 05 | 2024 | Meter waste water | $794 | $950 |
n/a
|
NL0105 #04 Y:2024 | 04 | 2024 | Change rate schedules or other changes in utility service | $2,197 | $40 |
n/a
|
NL0105 #03 Y:2024 | 03 | 2024 | Utilize higher efficiency lamps and/or ballasts | $10,009 | $9,991 |
n/a
|