18
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Iron and steel forgings | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0806 #18 Y:2009 | 18 | 2009 | Eliminate leaks in inert gas and compressed air lines/ valves | $624 | $1,000 | |
| UD0806 #17 Y:2009 | 17 | 2009 | Use / purchase optimum sized compressor | $1,995 | - | |
| UD0806 #16 Y:2009 | 16 | 2009 | Meter recycled water (to reduce sewer charges) | $2,636 | $4,000 | |
| UD0806 #15 Y:2009 | 15 | 2009 | Enhance sensitivity of temperature control and cutoff | $2,991 | $15,000 | |
| UD0806 #14 Y:2009 | 14 | 2009 | Utilize higher efficiency lamps and/or ballasts | $3,400 | $6,174 | |
| UD0806 #13 Y:2009 | 13 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $3,419 | $748 | |
| UD0806 #12 Y:2009 | 12 | 2009 | Utilize higher efficiency lamps and/or ballasts | $3,652 | $990 | |
| UD0806 #11 Y:2009 | 11 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $5,165 | $11,747 | |
| UD0806 #10 Y:2009 | 10 | 2009 | Use waste heat from hot flue gases to preheat | $6,025 | $3,000 | |
| UD0806 #09 Y:2009 | 09 | 2009 | Utilize higher efficiency lamps and/or ballasts | $8,111 | $12,665 | |
| UD0806 #08 Y:2009 | 08 | 2009 | Optimize plant power factor | $8,238 | $64,000 | |
| UD0806 #07 Y:2009 | 07 | 2009 | Utilize higher efficiency lamps and/or ballasts | $8,909 | $17,420 | |
| UD0806 #06 Y:2009 | 06 | 2009 | Insulate bare equipment | $10,900 | $5,010 | |
| UD0806 #05 Y:2009 | 05 | 2009 | Cover open tanks | $11,513 | $5,220 | |
| UD0806 #04 Y:2009 | 04 | 2009 | Use waste heat from hot flue gases to preheat | $29,959 | $10,000 | |
| UD0806 #03 Y:2009 | 03 | 2009 | Use adjustable frequency drive or multiple speed motors on existing system | $38,287 | $157,500 | |
| UD0806 #02 Y:2009 | 02 | 2009 | Turn off equipment when not in use | $75,878 | - | |
| UD0806 #01 Y:2009 | 01 | 2009 | Shift from daytime to nighttime operation | $169,364 | - |