Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

18

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Plumbing fixture fittings and trim
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KU0351 #05 Y:1991 Turn off equipment during breaks, reduce operating time $662 -
KU0351 #04 Y:1991 Re-size charging openings or add movable cover or door $1,047 $1,600
KU0351 #03 Y:1991 Install set-back timers $693 $400
KU0351 #02 Y:1991 Utilize higher efficiency lamps and/or ballasts $2,664 $744
KU0351 #01 Y:1991 Install timers and/or thermostats $5,020 $3,380
KU0143 #13 Y:1984 Lower temperature during the winter season and vice-versa $183 -
KU0143 #12 Y:1984 Install compressor air intakes in coolest locations $454 $300
KU0143 #11 Y:1984 Reduce hot water temperature to the minimum required $548 -
KU0143 #10 Y:1984 Replace broken windows and/or window sash $620 $920
KU0143 #09 Y:1984 Insulate bare equipment $663 $1,200
KU0143 #08 Y:1984 Insulate bare equipment $755 $500
KU0143 #07 Y:1984 Replace electrically-operated equipment with fossil fuel equipment $1,043 $1,200
KU0143 #06 Y:1984 Eliminate leaks in inert gas and compressed air lines/ valves $1,229 $650
KU0143 #05 Y:1984 Re-size charging openings or add a movable door on equipment $4,141 $2,000
KU0143 #04 Y:1984 Use demand controller or load shedder $4,586 $3,000
KU0143 #03 Y:1984 Improve lubrication practices $3,966 -
KU0143 #02 Y:1984 Eliminate leaks in inert gas and compressed air lines/ valves $12,840 -
KU0143 #01 Y:1984 Utilize higher efficiency lamps and/or ballasts $23,486 -