Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

13

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Drawing and insulating of nonferrous wire
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0721 #13 Y:2005 Use radiant heater for spot heating $506 $1,897
UD0721 #12 Y:2005 Install motor voltage controller on lightly loaded motors $560 $1,000
UD0721 #11 Y:2005 Install compressor air intakes in coolest locations $613 $420
UD0721 #10 Y:2005 Upgrade controls on compressors $614 -
UD0721 #09 Y:2005 Insulate bare equipment $675 $1,820
UD0721 #08 Y:2005 Size electric motors for peak operating efficiency $1,229 $860
UD0721 #07 Y:2005 Install occupancy sensors $2,714 $345
UD0721 #06 Y:2005 Utilize higher efficiency lamps and/or ballasts $5,040 $11,100
UD0721 #05 Y:2005 Analyze flue gas for proper air/fuel ratio $5,580 -
UD0721 #04 Y:2005 Use waste heat from hot flue gases to preheat $11,579 $12,000
UD0721 #03 Y:2005 Repair and eliminate steam leaks $11,745 $160
UD0721 #02 Y:2005 Utilize higher efficiency lamps and/or ballasts $30,010 $86,100
UD0721 #01 Y:2005 Recover mechanical energy $206,969 $413,938