11
matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| ST0069 #11 Y:1986 | 11 | 1986 | Analyze flue gas for proper air/fuel ratio | $342 | $268 | |
| ST0069 #10 Y:1986 | 10 | 1986 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $17,145 | $35,714 | |
| ST0069 #09 Y:1986 | 09 | 1986 | Utilize energy-efficient belts and other improved mechanisms | $774 | $470 | |
| ST0069 #08 Y:1986 | 08 | 1986 | Use most efficient type of electric motors | $587 | $1,750 | |
| ST0069 #07 Y:1986 | 07 | 1986 | Replace electrically-operated equipment with fossil fuel equipment | $225 | $400 | |
| ST0069 #06 Y:1986 | 06 | 1986 | Reduce hot water temperature to the minimum required | $164 | - | |
| ST0069 #05 Y:1986 | 05 | 1986 | Use computer programs to optimize hvac performance | $985 | $2,700 | |
| ST0069 #04 Y:1986 | 04 | 1986 | Utilize higher efficiency lamps and/or ballasts | $2,839 | $792 | |
| ST0069 #03 Y:1986 | 03 | 1986 | Analyze flue gas for proper air/fuel ratio | $3,893 | $269 | |
| ST0069 #02 Y:1986 | 02 | 1986 | Repair faulty insulation in furnaces, boilers, etc | $604 | $150 | |
| ST0069 #01 Y:1986 | 01 | 1986 | Eliminate leaks in inert gas and compressed air lines/ valves | $5,724 | - |