Assessment Year | 1986 |
---|---|
Principal Product | METAL STOCK FROM WASTE |
NAICS |
n/a
|
SIC | 3341: Secondary Smelting and Refining of Nonferrous Metals |
Sales Range | $10 M to 50M |
# of Employees | 55 |
Plant Area |
n/a
|
Annual Production | 20,400
ton
|
Production Hrs. Annual | 2,375
hrs
|
Location (State) | New York |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $92,619 | 1,157,093 |
kWh
|
$0.080 |
Natural Gas | $77,949 | 13,674 |
MMBtu
|
$5.70 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $33,282 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $15,748 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $5,724 | - |
$5,724
71,512
kWh
|
- | |
02 | 2.1131: Repair faulty insulation in furnaces, boilers, etc | $604 | $150 | - |
$604
-
MMBtu
|
|
03 | 2.1233: Analyze flue gas for proper air/fuel ratio | $3,893 | $269 | - |
$3,893
-
MMBtu
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,839 | $792 |
$2,839
35,463
kWh
|
- | |
05 | 2.7226: Use computer programs to optimize hvac performance | $985 | $2,700 |
$985
12,309
kWh
|
- | |
06 | 2.6121: Reduce hot water temperature to the minimum required | $164 | - |
$164
2,052
kWh
|
- | |
07 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $225 | $400 |
$328
4,103
kWh
|
$(-103.0)
-
MMBtu
|
|
08 | 2.4133: Use most efficient type of electric motors | $587 | $1,750 |
$587
7,327
kWh
|
- | |
09 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $774 | $470 |
$774
9,672
kWh
|
- | |
10 | 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $17,145 | $35,714 | - |
$17,145
-
MMBtu
|
|
11 | 2.1233: Analyze flue gas for proper air/fuel ratio | $342 | $268 | - |
$342
-
MMBtu
|
|
TOTAL RECOMMENDED | $33,282 | $42,513 |
$11,401
142,438
kWh
|
$21,881
-
MMBtu
|
||
TOTAL IMPLEMENTED | $15,748 | $6,399 |
$10,909
136,283
kWh
|
$4,839
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs