Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product METAL STOCK FROM WASTE
NAICS
n/a
SIC 3341: Secondary Smelting and Refining of Nonferrous Metals
Sales Range $10
M
to 50
M
# of Employees 55
Plant Area
n/a
Annual Production 20,400
ton
Production Hrs. Annual 2,375
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $92,619 1,157,093
kWh
Natural Gas $77,949 13,674
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $33,282 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,748

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,724 - $5,724
71,512
kWh
-
02 2.1131: Repair faulty insulation in furnaces, boilers, etc $604 $150 - $604
-
MMBtu
03 2.1233: Analyze flue gas for proper air/fuel ratio $3,893 $269 - $3,893
-
MMBtu
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,839 $792 $2,839
35,463
kWh
-
05 2.7226: Use computer programs to optimize hvac performance $985 $2,700 $985
12,309
kWh
-
06 2.6121: Reduce hot water temperature to the minimum required $164 - $164
2,052
kWh
-
07 2.1311: Replace electrically-operated equipment with fossil fuel equipment $225 $400 $328
4,103
kWh
$(-103.0)
-
MMBtu
08 2.4133: Use most efficient type of electric motors $587 $1,750 $587
7,327
kWh
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $774 $470 $774
9,672
kWh
-
10 2.2492: Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $17,145 $35,714 - $17,145
-
MMBtu
11 2.1233: Analyze flue gas for proper air/fuel ratio $342 $268 - $342
-
MMBtu
TOTAL RECOMMENDED $33,282 $42,513 $11,401
142,438
kWh
$21,881
-
MMBtu
TOTAL IMPLEMENTED $15,748 $6,399 $10,909
136,283
kWh
$4,839
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs