8
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Primary smelting and refining of nonferrous metals, except copper and aluminum | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UM0435 #04 Y:2013 | 04 | 2013 | Recover waste heat from equipment | $2,000 | $3,000 | |
| UM0435 #03 Y:2013 | 03 | 2013 | Install compressor air intakes in coolest locations | $966 | $2,500 | |
| UM0435 #02 Y:2013 | 02 | 2013 | Reduce the pressure of compressed air to the minimum required | $4,500 | $200 | |
| UM0435 #01 Y:2013 | 01 | 2013 | Replace existing chiller with high efficiency model | $4,450 | $4,500 | |
| UM0022 #04 Y:1995 | 04 | 1995 | Insulate glazing, walls, ceilings, and roofs | $2,583 | $6,080 | |
| UM0022 #03 Y:1995 | 03 | 1995 | Change rate schedules or other changes in utility service | $31,536 | $250 | |
| UM0022 #02 Y:1995 | 02 | 1995 | Utilize higher efficiency lamps and/or ballasts | $2,344 | $4,614 | |
| UM0022 #01 Y:1995 | 01 | 1995 | Use most efficient type of electric motors | $540 | $367 |