213
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Nonmetallic mineral products, not elsewhere classified | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| OR0837 #07 Y:2026 | 07 | 2026 | Use solar heat to make electricty | $30,170 | $735,960 |
n/a
|
| OR0837 #06 Y:2026 | 06 | 2026 | Adopt in-house material generation | $6,766 | $68,142 |
n/a
|
| OR0837 #05 Y:2026 | 05 | 2026 | Maintain air filters by cleaning or replacement | $8,393 | $10,000 |
n/a
|
| OR0837 #04 Y:2026 | 04 | 2026 | Replace treated water with well / surface water | $8,249 | $6,786 |
n/a
|
| OR0837 #03 Y:2026 | 03 | 2026 | Use flow control valves on equipment to optimize water use | $79,017 | $25,616 |
n/a
|
| OR0837 #02 Y:2026 | 02 | 2026 | Use or replace with energy efficient substitutes | $1,500 | - |
n/a
|
| OR0837 #01 Y:2026 | 01 | 2026 | Turn off equipment during breaks, reduce operating time | $36,378 | - |
n/a
|
| AM0968 #05 Y:2025 | 05 | 2025 | Replace existing hvac unit with high efficiency model | $54,220 | $405,000 |
n/a
|
| AM0968 #04 Y:2025 | 04 | 2025 | Use / purchase optimum sized compressor | $6,550 | $13,740 |
n/a
|
| AM0968 #03 Y:2025 | 03 | 2025 | Install timers and/or thermostats | $11,780 | $1,840 |
n/a
|
| AM0968 #02 Y:2025 | 02 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,660 | $1,480 |
n/a
|
| AM0968 #01 Y:2025 | 01 | 2025 | Eliminate or reduce compressed air usage | $7,410 | $520 |
n/a
|
| UW2515 #04 Y:2025 | 04 | 2025 | Use battery storage for demand control | $20,506 | $16,909 | |
| UW2515 #03 Y:2025 | 03 | 2025 | Install occupancy sensors | $2,230 | $1,712 | |
| UW2515 #02 Y:2025 | 02 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $2,985 | $5,850 | |
| UW2515 #01 Y:2025 | 01 | 2025 | Use most efficient type of electric motors | $8,499 | $27,909 | |
| NT0012 #06 Y:2023 | 06 | 2023 | Reduce scrap production | $80,000 | $20,000 | |
| NT0012 #05 Y:2023 | 05 | 2023 | Lower temperature during the winter season and vice-versa | $335 | - | |
| NT0012 #04 Y:2023 | 04 | 2023 | Regrind, reuse, or sell scrap plastic parts | $13,612 | - | |
| NT0012 #03 Y:2023 | 03 | 2023 | Clean or color roof to reduce solar load | $315 | $200 |