Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

213

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonmetallic mineral products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
OR0837 #07 Y:2026 Use solar heat to make electricty $30,170 $735,960
OR0837 #06 Y:2026 Adopt in-house material generation $6,766 $68,142
OR0837 #05 Y:2026 Maintain air filters by cleaning or replacement $8,393 $10,000
OR0837 #04 Y:2026 Replace treated water with well / surface water $8,249 $6,786
OR0837 #03 Y:2026 Use flow control valves on equipment to optimize water use $79,017 $25,616
OR0837 #02 Y:2026 Use or replace with energy efficient substitutes $1,500 -
OR0837 #01 Y:2026 Turn off equipment during breaks, reduce operating time $36,378 -
AM0968 #05 Y:2025 Replace existing hvac unit with high efficiency model $54,220 $405,000
AM0968 #04 Y:2025 Use / purchase optimum sized compressor $6,550 $13,740
AM0968 #03 Y:2025 Install timers and/or thermostats $11,780 $1,840
AM0968 #02 Y:2025 Eliminate leaks in inert gas and compressed air lines/ valves $8,660 $1,480
AM0968 #01 Y:2025 Eliminate or reduce compressed air usage $7,410 $520
UW2515 #04 Y:2025 Use battery storage for demand control $20,506 $16,909
UW2515 #03 Y:2025 Install occupancy sensors $2,230 $1,712
UW2515 #02 Y:2025 Use adjustable frequency drive or multiple speed motors on existing system $2,985 $5,850
UW2515 #01 Y:2025 Use most efficient type of electric motors $8,499 $27,909
NT0012 #06 Y:2023 Reduce scrap production $80,000 $20,000
NT0012 #05 Y:2023 Lower temperature during the winter season and vice-versa $335 -
NT0012 #04 Y:2023 Regrind, reuse, or sell scrap plastic parts $13,612 -
NT0012 #03 Y:2023 Clean or color roof to reduce solar load $315 $200