Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

197

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Nonmetallic mineral products, not elsewhere classified
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NT0012 #06 Y:2023 Reduce scrap production $80,000 $20,000
NT0012 #05 Y:2023 Lower temperature during the winter season and vice-versa $335 -
NT0012 #04 Y:2023 Regrind, reuse, or sell scrap plastic parts $13,612 -
NT0012 #03 Y:2023 Clean or color roof to reduce solar load $315 $200
NT0012 #02 Y:2023 Optimize plant power factor $4,568 $1,441
NT0012 #01 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $7,463 $4,553
WV0635 #11 Y:2022 Eliminate or reduce compressed air usage $57 $88
WV0635 #10 Y:2022 Develop a repair/replace policy $546 $1,571
WV0635 #09 Y:2022 Establish a predictive maintenance program $672 $1,500
WV0635 #08 Y:2022 Reduce the pressure of compressed air to the minimum required $949 $525
WV0635 #07 Y:2022 Use flow control valves on equipment to optimize water use $2,027 $394
WV0635 #06 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,309 $218
WV0635 #05 Y:2022 Install set-back timers $3,167 $1,125
WV0635 #04 Y:2022 Upgrade controls on compressors $3,209 $6,354
WV0635 #03 Y:2022 Utilize higher efficiency lamps and/or ballasts $3,990 $4,945
WV0635 #02 Y:2022 Level zero – install control systems for existing equipment $4,325 $5,360
WV0635 #01 Y:2022 Reschedule plant operations or reduce load to avoid peaks $9,179 $6,500
MA0838 #06 Y:2022 Turn off equipment when not in use $1,706 $250
MA0838 #05 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $4,687 $6,969
MA0838 #04 Y:2022 Reduce the pressure of compressed air to the minimum required $6,501 $500