Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

11

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Asbestos products
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0172 #07 Y:1992 Turn off equipment during breaks, reduce operating time $120 -
AM0172 #06 Y:1992 Reduce the pressure of compressed air to the minimum required $280 -
AM0172 #05 Y:1992 Utilize higher efficiency lamps and/or ballasts $550 $22
AM0172 #04 Y:1992 Utilize higher efficiency lamps and/or ballasts $3,280 $7,390
AM0172 #03 Y:1992 Use / purchase optimum sized compressor $3,600 -
AM0172 #02 Y:1992 Optimize plant power factor $4,110 $8,000
AM0172 #01 Y:1992 Use adjustable frequency drive or multiple speed motors on existing system $5,300 $112
TN0453 #04 Y:1992 Reduce the pressure of compressed air to the minimum required $6,098 $16,000
TN0453 #03 Y:1992 Utilize energy-efficient belts and other improved mechanisms $11,778 $7,975
TN0453 #02 Y:1992 Keep lamps and reflectors clean $14,854 $39,353
TN0453 #01 Y:1992 Recover waste heat from equipment $5,100 $2,055