11
matching recommendations
$
$
ARC | 2+ Digits Required | |
NAICS | 3+ Digits Required | |
SIC | Asbestos products | |
3+ Characters Required for Products |
ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
AM0172 #07 Y:1992 | 07 | 1992 | Turn off equipment during breaks, reduce operating time | $120 | - | |
AM0172 #06 Y:1992 | 06 | 1992 | Reduce the pressure of compressed air to the minimum required | $280 | - | |
AM0172 #05 Y:1992 | 05 | 1992 | Utilize higher efficiency lamps and/or ballasts | $550 | $22 | |
AM0172 #04 Y:1992 | 04 | 1992 | Utilize higher efficiency lamps and/or ballasts | $3,280 | $7,390 | |
AM0172 #03 Y:1992 | 03 | 1992 | Use / purchase optimum sized compressor | $3,600 | - | |
AM0172 #02 Y:1992 | 02 | 1992 | Optimize plant power factor | $4,110 | $8,000 | |
AM0172 #01 Y:1992 | 01 | 1992 | Use adjustable frequency drive or multiple speed motors on existing system | $5,300 | $112 | |
TN0453 #04 Y:1992 | 04 | 1992 | Reduce the pressure of compressed air to the minimum required | $6,098 | $16,000 | |
TN0453 #03 Y:1992 | 03 | 1992 | Utilize energy-efficient belts and other improved mechanisms | $11,778 | $7,975 | |
TN0453 #02 Y:1992 | 02 | 1992 | Keep lamps and reflectors clean | $14,854 | $39,353 | |
TN0453 #01 Y:1992 | 01 | 1992 | Recover waste heat from equipment | $5,100 | $2,055 |