matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0937 #10 Y:2015 | 10 | 2015 | Utilize energy-efficient belts and other improved mechanisms | $948 | - | |
| UD0937 #09 Y:2015 | 09 | 2015 | Develop a repair/replace policy | $330 | $1,911 | |
| UD0937 #08 Y:2015 | 08 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $3,212 | $3,075 | |
| UD0937 #07 Y:2015 | 07 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $3,268 | $4,200 | |
| UD0937 #06 Y:2015 | 06 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $32,682 | $20,800 | |
| UD0937 #05 Y:2015 | 05 | 2015 | Eliminate or reduce compressed air usage | $114 | $150 | |
| UD0937 #04 Y:2015 | 04 | 2015 | Install compressor air intakes in coolest locations | $5,762 | $2,000 | |
| UD0937 #03 Y:2015 | 03 | 2015 | Make a practice of turning off lights when not needed | $1,253 | - | |
| UD0937 #02 Y:2015 | 02 | 2015 | Utilize daylight whenever possible in lieu of artificial light | $6,573 | $2,850 | |
| UD0937 #01 Y:2015 | 01 | 2015 | Utilize daylight whenever possible in lieu of artificial light | $8,087 | - | |
| UD0925 #09 Y:2015 | 09 | 2015 | Contract a wood pallet recycling company | $5,400 | - | |
| UD0925 #08 Y:2015 | 08 | 2015 | Install sensors to detect and avoid jams | $7,714 | $120,000 | |
| UD0925 #07 Y:2015 | 07 | 2015 | Use adjustable frequency drive or multiple speed motors on existing system | $15,405 | $66,200 | |
| UD0925 #06 Y:2015 | 06 | 2015 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,964 | $1,000 | |
| UD0925 #05 Y:2015 | 05 | 2015 | Install compressor air intakes in coolest locations | $3,759 | $5,000 | |
| UD0925 #04 Y:2015 | 04 | 2015 | Upgrade controls on compressors | $4,804 | $34,000 | |
| UD0925 #03 Y:2015 | 03 | 2015 | Use optimum temperature | $46,665 | - | |
| UD0925 #02 Y:2015 | 02 | 2015 | Insulate bare equipment | $221,454 | $15,345 | |
| UD0925 #01 Y:2015 | 01 | 2015 | Chill water to the highest temperature possible | $860 | - | |
| UD0909 #12 Y:2014 | 12 | 2014 | Use waste heat from hot flue gases to preheat | $5,987 | $17,000 |