ITAC Assessment: ST0052
ITAC logo
ITAC Assessment: ST0052
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product PERLITE & VERMICULITE
NAICS
n/a
SIC 3295: Minerals and Earths, Ground or Otherwise Treated
Sales Range $1
M
to 5
M
# of Employees 25
Plant Area
n/a
Annual Production 10,000
ton
Production Hrs. Annual 7,200
hrs
Location (State) New Jersey

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $41,164 431,125
kWh
Natural Gas $140,038 19,872
MMBtu
Fuel Oil #2 $85,919 14,280
MMBtu
Other Energy $29,333 3,733
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,443 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $9,686

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Energy Savings
01 2.4133: Use most efficient type of electric motors $3,819 $3,000 $3,819
40,152
kWh
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $593 $50 $593
6,155
kWh
- - -
03 2.4231: Reduce the pressure of compressed air to the minimum required $154 - $154
1,465
kWh
- - -
04 2.8223: Add air shields to trucks to increase fuel mileage $2,256 $3,000 - - - $2,256
-
MMBtu
05 2.2511: Insulate bare equipment $4,908 $2,600 - $4,908
-
MMBtu
- -
06 2.2511: Insulate bare equipment $2,327 $600 - - $2,327
-
MMBtu
-
07 2.2511: Insulate bare equipment $2,695 $1,000 - $2,695
-
MMBtu
- -
08 2.2443: Re-use or recycle hot or cold process exhaust air $251 $700 - - $251
-
MMBtu
-
09 2.4111: Utilize energy-efficient belts and other improved mechanisms $440 $200 $440
4,689
kWh
- - -
TOTAL RECOMMENDED $17,443 $11,150 $5,006
52,461
kWh
$7,603
-
MMBtu
$2,578
-
MMBtu
$2,256
-
MMBtu
TOTAL IMPLEMENTED $9,686 $7,550 $4,852
50,996
kWh
- $2,578
-
MMBtu
$2,256
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #2 Savings Other Energy Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs