Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

503

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Perfumes, cosmetics, and other toilet preparations
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
LE0438 #06 Y:2017 Replace existing hvac unit with high efficiency model $185,116 $366,000
LE0438 #05 Y:2017 Use adjustable frequency drive or multiple speed motors on existing system $19,106 $13,000
LE0438 #04 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $27,655 $10,500
LE0438 #03 Y:2017 Install occupancy sensors $2,264 $710
LE0438 #02 Y:2017 Repair or replace steam traps $47,084 $4,750
LE0438 #01 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $24,701 $1,000
SD0533 #07 Y:2016 Use photocell controls $2,169 $3,700
SD0533 #06 Y:2016 Utilize daylight whenever possible in lieu of artificial light $2,827 $5,600
SD0533 #05 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $3,056 $1,000
SD0533 #04 Y:2016 Optimize plant power factor $4,856 $2,339
SD0533 #03 Y:2016 Utilize controls to operate equipment only when needed $11,672 $7,800
SD0533 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $17,187 $25,315
SD0533 #01 Y:2016 Use a fossil fuel engine to cogenerate electricity or motive power; and utilize heat $65,643 $292,000
UK1603 #10 Y:2016 Reduce combustion air flow to optimum $2,457 -
UK1603 #09 Y:2016 Preheat combustion air with waste heat $33,165 $58,682
UK1603 #08 Y:2016 Recover heat from exhausted steam, hot air or hot water $33,264 $30,000
UK1603 #07 Y:2016 Reduce space conditioning during non-working hours $16,948 -
UK1603 #06 Y:2016 Install compressor air intakes in coolest locations $1,304 $1,600
UK1603 #05 Y:2016 Reduce the pressure of compressed air to the minimum required $3,058 -
UK1603 #04 Y:2016 Use or replace with energy efficient substitutes $9,160 $14,700