28
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Soap and other detergents, except specialty cleaners | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD0921 #12 Y:2014 | 12 | 2014 | Clean fouling from water lines regularly | $4,725 | $11,000 | |
| UD0921 #11 Y:2014 | 11 | 2014 | Utilize daylight whenever possible in lieu of artificial light | $2,030 | $6,052 | |
| UD0921 #10 Y:2014 | 10 | 2014 | Insulate bare equipment | $3,379 | $8,000 | |
| UD0921 #09 Y:2014 | 09 | 2014 | Use adjustable frequency drive or multiple speed motors on existing system | $1,190 | $4,300 | |
| UD0921 #08 Y:2014 | 08 | 2014 | Turn off equipment during breaks, reduce operating time | $1,618 | $700 | |
| UD0921 #07 Y:2014 | 07 | 2014 | Install compressor air intakes in coolest locations | $1,470 | $1,000 | |
| UD0921 #06 Y:2014 | 06 | 2014 | Recover waste heat from equipment | $1,838 | $1,250 | |
| UD0921 #05 Y:2014 | 05 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,887 | $950 | |
| UD0921 #04 Y:2014 | 04 | 2014 | Install / repair insulation on condensate lines | $381 | $275 | |
| UD0921 #03 Y:2014 | 03 | 2014 | Analyze flue gas for proper air/fuel ratio | $723 | - | |
| UD0921 #02 Y:2014 | 02 | 2014 | Utilize energy-efficient belts and other improved mechanisms | $405 | - | |
| UD0921 #01 Y:2014 | 01 | 2014 | Reduce ventilation air | $16,159 | - | |
| UD0598 #09 Y:2000 | 09 | 2000 | Utilize higher efficiency lamps and/or ballasts | $1,088 | $4,253 | |
| UD0598 #08 Y:2000 | 08 | 2000 | Replace city water with recycled water via cooling tower | $1,720 | $500 | |
| UD0598 #07 Y:2000 | 07 | 2000 | Install occupancy sensors | $1,752 | $726 | |
| UD0598 #06 Y:2000 | 06 | 2000 | Use minimum steam operating pressure | $3,333 | - | |
| UD0598 #05 Y:2000 | 05 | 2000 | Check for accuracy of utility / power meters | $9,640 | - | |
| UD0598 #04 Y:2000 | 04 | 2000 | Purchase high materials in returnable bulk containers | $13,603 | - | |
| UD0598 #03 Y:2000 | 03 | 2000 | Increase amount of condensate returned | $15,756 | $18,000 | |
| UD0598 #02 Y:2000 | 02 | 2000 | Use closed cycle process to minimize waste water production | $22,073 | $34,288 |