Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

28

matching recommendations
$
$
ARC 2+ Digits Required
NAICS 3+ Digits Required
SIC Soap and other detergents, except specialty cleaners
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UD0921 #12 Y:2014 Clean fouling from water lines regularly $4,725 $11,000
UD0921 #11 Y:2014 Utilize daylight whenever possible in lieu of artificial light $2,030 $6,052
UD0921 #10 Y:2014 Insulate bare equipment $3,379 $8,000
UD0921 #09 Y:2014 Use adjustable frequency drive or multiple speed motors on existing system $1,190 $4,300
UD0921 #08 Y:2014 Turn off equipment during breaks, reduce operating time $1,618 $700
UD0921 #07 Y:2014 Install compressor air intakes in coolest locations $1,470 $1,000
UD0921 #06 Y:2014 Recover waste heat from equipment $1,838 $1,250
UD0921 #05 Y:2014 Eliminate leaks in inert gas and compressed air lines/ valves $2,887 $950
UD0921 #04 Y:2014 Install / repair insulation on condensate lines $381 $275
UD0921 #03 Y:2014 Analyze flue gas for proper air/fuel ratio $723 -
UD0921 #02 Y:2014 Utilize energy-efficient belts and other improved mechanisms $405 -
UD0921 #01 Y:2014 Reduce ventilation air $16,159 -
UD0598 #09 Y:2000 Utilize higher efficiency lamps and/or ballasts $1,088 $4,253
UD0598 #08 Y:2000 Replace city water with recycled water via cooling tower $1,720 $500
UD0598 #07 Y:2000 Install occupancy sensors $1,752 $726
UD0598 #06 Y:2000 Use minimum steam operating pressure $3,333 -
UD0598 #05 Y:2000 Check for accuracy of utility / power meters $9,640 -
UD0598 #04 Y:2000 Purchase high materials in returnable bulk containers $13,603 -
UD0598 #03 Y:2000 Increase amount of condensate returned $15,756 $18,000
UD0598 #02 Y:2000 Use closed cycle process to minimize waste water production $22,073 $34,288