11
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | 3+ Digits Required | |
| SIC | Biological products, except diagnostic substances | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| NC0470 #11 Y:2012 | 11 | 2012 | Utilize other methods to remove contaminants | $1,331,790 | $2,000,000 | |
| NC0470 #10 Y:2012 | 10 | 2012 | Utilize higher efficiency lamps and/or ballasts | $883 | $1,575 | |
| NC0470 #09 Y:2012 | 09 | 2012 | Utilize higher efficiency lamps and/or ballasts | $9,234 | $33,182 | |
| NC0470 #08 Y:2012 | 08 | 2012 | Utilize higher efficiency lamps and/or ballasts | $39,181 | $151,669 | |
| NC0470 #07 Y:2012 | 07 | 2012 | Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air | $12,321 | $36,400 | |
| NC0470 #06 Y:2012 | 06 | 2012 | Recover waste heat from equipment | $35,967 | $85,750 | |
| NC0470 #05 Y:2012 | 05 | 2012 | Reduce the pressure of compressed air to the minimum required | $5,091 | $400 | |
| NC0470 #04 Y:2012 | 04 | 2012 | Analyze flue gas for proper air/fuel ratio | $671 | $1,100 | |
| NC0470 #03 Y:2012 | 03 | 2012 | Analyze flue gas for proper air/fuel ratio | $1,336 | $1,200 | |
| NC0470 #02 Y:2012 | 02 | 2012 | Use heat from boiler blowdown to preheat boiler feed water | $11,916 | $18,000 | |
| NC0470 #01 Y:2012 | 01 | 2012 | Reduce excessive boiler blowdown | $1,179 | - |